Early Stage (10% complete)No litigation on record

Lodha Sylvan

by Lodha Developers (Macrotech Developers Limited) · Hinjawadi, Pune

₹1.10 Cr – ₹2.21 Cr

Lodha Sylvan photograph 1
Lodha Sylvan photograph 2
Lodha Sylvan photograph 3
Photo 1 of 3

Land parcel

~14.85–15 acres

Towers / Floors

16 towers · G+30 per the developer brief and our strongest sources; also published as G+22 and as 36 total floors (≈G+35) — see cons

Configurations

2 BHK · 3 BHK

Carpet area

836–1428 sqft

Possession status

Early Stage (10% complete)

Target possession

December 2029

Litigation

None on record

Property Engineer Verdict

Our composite score for Lodha Sylvan across legal standing, builder record, livability, connectivity and value — plus the buy, wait or walk-away call.

Free. One call from an advisor, never sold on.

Overview

About the project

Lodha Sylvan is a 16-tower master plan on roughly 15 acres near Megapolis Circle in Hinjewadi Phase 3, built by India's largest listed developer, Lodha Developers (Macrotech Developers Limited, NSE- and BSE-listed since 2021). The current release covers 11 of the 16 planned towers at G+30, offering 2 BHK, 2.5 BHK, 3 BHK and 3.5 BHK homes from 836 to 1,428 sq ft carpet at ₹1.10 Cr to ₹2.21 Cr — the most expensive project in our coverage in absolute terms, though the underlying rate of roughly ₹13,750 per carpet sq ft reflects Phase 3's still-developing status rather than Phase 1's built-out premium. The reason to look is the developer: a genuinely national, audited, publicly reporting company is a different kind of counterparty from the regional Pune builders that make up most of our coverage. The reason to read carefully is that this is also the most internally inconsistent listing we carry — seven different RERA numbers, four different floor counts, two incompatible readings of flats-per-floor and lift count, and a total unit figure that does not multiply out against any published version of the tower structure. None of that is disqualifying on a project this size, where registering towers separately is normal practice — but it means more homework, not less, before choosing a specific tower and flat.

Near Megapolis Circle, MIDC Phase 3 Road, Hinjewadi Phase 3, Rajiv Gandhi Infotech Park, Pimpri-Chinchwad, Pune 411057

Developer's official project page

Nearby landmarks

  • Megapolis CircleAdjacent
  • Hinjawadi–Pirangut Road900 m
  • Tech Mahindra1.1 km
  • Capgemini India3.1 km
  • Megapolis Metro Station (Pune Metro Line 3)≈ 5 min
  • Mumbai–Pune Expressway≈ 15 min drive
  • Akurdi Railway Station≈ 10 km
  • Pune International Airport≈ 1 hr 8 min

See it

Walkthrough & location

Developer walkthrough, published as issued.Watch on their site
Map showing the location of Lodha Sylvan, Lodha Hinjewadi Phase III, near Megapolis Circle metro station, Phase 3, Rajiv Gandhi Infotech Park, Hinjawadi, Pune, Maharashtra 411057, India
Lodha Hinjewadi Phase III, near Megapolis Circle metro station, Phase 3, Rajiv Gandhi Infotech Park, Hinjawadi, Pune, Maharashtra 411057, IndiaOpen in Google Maps

The neighbourhood

What is around the project

Facing road to the society~24 m Development Plan (DP) road— the wider the approach road, the easier access stays as the area builds out.

  • Rajiv Gandhi Infotech Park, Hinjawadi Phase 3Adjacent
  • Hinjawadi Phase 2≈ 3 km
  • Hinjawadi Phase 1≈ 6 km
  • TCS Campus≈ 2 min drive

  • Schools within the Hinjewadi Phase 3 catchment≈ 5 min drive
  • Blue Ridge Public School≈ 4 km

  • International Institute of Information Technology (I²IT), Hinjawadi≈ 5 km
  • Symbiosis International University, Lavale≈ 8 km

  • Blue Ridge Town, Hinjawadi Phase 3Nearby
  • Krisala 41 Zoy+, Hinjawadi Phase 1 — different phase≈ 6 km

Our read

Pros & cons

Pros & cons

The strengths and the drawbacks we found, written as plainly as each other.

Free. One call from an advisor, never sold on.

Build quality

Structure & specification

Construction type

Mivan / aluminium formwork technology, RCC monolithic structure

Ceiling height

~10 ft clear floor-to-ceiling

Flats per floor

4

Lifts per tower

3–4 high-speed lifts per tower (one source instead gives 6 flats per floor on only 2 lifts — see cons)

Parking levels

3 levels — 2 basements plus ground/podium parking

Parking per flat

1 covered space per flat; 2 reserved for select 3/3.5 BHK variants

Balconies

~22 ft wide private sundeck off the living room

Dry balcony

Dedicated utility balcony attached to the kitchen

Specification

Amenities

Internal

Digital Door LocksVideo Door PhoneVitrified Tile FlooringGranite Kitchen PlatformMivan RCC Monolithic Construction~10 ft Clear Ceiling HeightDedicated Dry Utility Balcony

External

Lap PoolVitality PoolKids' Pool with Parent's DeckClubhouseWellness SpaGymnasiumIndoor Arena — Basketball and BadmintonTennis CourtBowling AlleyTable TennisMultipurpose CourtYoga and Meditation ZoneZen Gardens and Reflexology PathCycle TrackJogging TrackParty Lawn and Party HallCafe / Coffee BarReading Room / LibrarySenior Citizens' AreaLandscaped 5-acre Podium24/7 Security with CCTV Surveillance

Costs

Pricing & unit plans

ConfigurationCarpet areaAll-inclusive priceMin. down paymentFloor plan
2 BHK836 sqft₹1.15 Cr₹17.00 Lacs—
2 BHK955 sqft₹1.45 Cr——
3 BHK1132 sqft₹1.75 Cr—
3 BHK1428 sqft₹2.21 Cr—

Maintenance charges

  • 2 BHK₹4,000/month
  • 3 BHK₹5,600 – ₹7,000/month

Payment scheme

CLP (Construction Linked Plan)

Standard slab-wise payment against construction progress. A separate booking amount of ₹1.8 Lacs on the 2 BHK and ₹2.7 Lacs on the 3 BHK is reported on one source ahead of the full minimum down payment of ₹17.00 Lacs quoted elsewhere — establish which figure is the genuine booking token and which is the down payment before paying anything. Approved with State Bank of India, HDFC Bank, ICICI Bank, Axis Bank, Kotak Mahindra Bank, Citi Bank, Bank of Baroda, Bank of India, Union Bank of India and Central Bank of India.

Pricing intelligence

The quoted price is where the conversation starts.

Lodha Sylvan is quoted at ₹1.10 Cr – ₹2.21 Cr. Tell us where to reach you and we will send the closable price — plus how it stacks up against the projects around it.

  • Comparative pricing against nearby projects, per square foot
  • The price this project actually closes at, not the quoted one
  • Backed by registered sale agreements from the last six months

Get the closable price

Free, and no obligation to buy through us.

+91

One call from an advisor. Your number is never sold on.

Investment outlook

Appreciation & rental income

Appreciation & rental income

What this micro-market has appreciated at, and the rent a 2 or 3 BHK here actually commands.

Free. One call from an advisor, never sold on.

Handover

Possession & delivery

Build stage

Early Stage (10% complete)

Builder's target

December 2029

RERA committed date

December 2030

Construction complete

10% complete as of 1 March 2026

The developer is quoting December 2029, but the date it is legally committed to under RERA is December 2030 — 12 months later. Plan around the RERA date; the earlier one carries no penalty if it slips.

Development plan & survey

Survey numbers
Not published. The corroborated address is near Megapolis Circle, MIDC Phase 3 Road, Hinjewadi Phase 3 — not the Gahunje/St Tukaram Nagar address given on one developer-facing microsite, which is almost certainly copied from an unrelated Mamurdi listing.
Zoning
Not yet verified against the PMRDA / MIDC Hinjewadi Phase 3 Development Plan
Road reservations
Not yet verified — the client's brief states a ~24 m DP road frontage; check this against the sanctioned road-widening line before relying on it
Future DP proposals
Metro Line 3 (Hinjewadi–Shivajinagar) serves this phase; confirm the alignment and the nearest station against the plot boundary once the map location is pinned
DP remarks
No survey number is published anywhere, which is the main blocker on this section. It is also the only way to resolve which of the seven RERA registrations governs the specific plot and tower being sold, and to check the true land area (14.85 versus 15 acres) against the 7/12 extract.

Due diligence

Legal & litigation

MahaRERA registration

Seven registrations published — PR1260002502131, PR1260002502408, PR1260002502618, PR1260002502575, PR1260002502581, PR1260002502578, PR1260002502576 — which tower each covers is not published (see cons). A further, unrelated number, PM1260002501593, appears on one source only.

Verify on the official MahaRERA portal

Litigation status

No litigation on record

Paperwork

Documents

Paperwork & documents

The title, approval and layout documents we hold on this project, and how to request copies.

Free. One call from an advisor, never sold on.

Developer

Builder profile

Lodha Developers (Macrotech Developers Limited)

Building since

1980

Years of experience

46

Total projects

91

Cities of operation

Mumbai, Thane, Pune

Our builder grade

A Cat

Lodha was founded in 1980 by Mangal Prabhat Lodha and today trades corporately as Macrotech Developers Limited, incorporated in 1995 and renamed Lodha Developers Limited in June 2025. It is India's largest real estate developer by pre-sales and has been listed on the NSE and BSE since its April 2021 IPO. As of its last disclosed milestone the group had completed 91 projects covering 77.22 million sq ft, spanning both affordable and premium segments, with an active current pipeline concentrated in the Mumbai Metropolitan Region and Pune. Locally, Lodha Belmondo at Maval and Lodha Panache are established Pune projects, alongside the newer Kharadi Pune Phase II towers and this Hinjewadi Phase 3 launch. Two live 2026 MahaRERA matters in Pune and a resolved family governance dispute are recorded in full in builderLitigationSummary and builderBackgroundNotes.

Background

Lodha is India's largest real estate developer by pre-sales, trading corporately as Macrotech Developers Limited (incorporated 1995, NSE- and BSE-listed since its April 2021 IPO) and renamed Lodha Developers Limited in June 2025. As of its last disclosed milestone the group had completed 91 projects totalling 77.22 million sq ft, with a substantial share in the affordable segment alongside its premium Mumbai portfolio, and now runs an active pipeline across the Mumbai Metropolitan Region and Pune, including Lodha Belmondo, Lodha Panache and the Kharadi Pune Phase II towers. This is the only publicly listed, nationally scaled developer in our coverage, and its scale is real: audited consolidated financials, exchange disclosure obligations and a much larger legal and compliance function than any regional builder we track. Two things temper that scale. First, a family governance dispute among the Lodha brothers over the group's structure was reported and resolved in 2025 — resolved rather than ongoing, but worth knowing the group has had one. Second, and more directly relevant to a buyer here, MahaRERA has two live 2026 matters naming Lodha Developers Limited in Pune specifically: an adverse finding on refuge-floor documentation and excess maintenance billing at Lodha Belmondo, and a dismissed-but-contested dispute over agreement signing at Lodha Kharadi Pune Phase II where the developer moved to a Final Notice before Termination against the buyer. Neither is a structural defect finding of the kind recorded against Krisala in our other listings, but both show a company that will enforce its own paperwork and timelines assertively. Separately, three Lodha-linked entities in Thane are reported seeking voluntary project deregistration, a corporate signal unrelated to Pune but worth tracking.

15-year litigation search on the developer

No litigation is disclosed against Lodha Sylvan itself, and `litigation` is set false accordingly. The promoter nonetheless carries two live, named MahaRERA matters in Pune during 2026. In April 2026 MahaRERA directed Lodha Developers Limited to provide certified clarification of the legal status of a flat allegedly on a refuge floor and to refund excess maintenance charges levied before possession, in a dispute over Lodha Belmondo, Maval. In May 2026 MahaRERA dismissed a homebuyer's complaint against Lodha Developers Limited concerning Lodha Kharadi Pune Phase II Tower 8 as premature and not maintainable, after the developer argued the complaint was filed to delay signing the Agreement for Sale and issued a Final Notice before Termination; the buyer had booked a ₹1.49 crore apartment in March 2025. Neither matter concerns this project. Separately, three Lodha/Palava Dwellers projects in Thane are reported as seeking voluntary deregistration. Our own 15-year civil and criminal search on Lodha Developers Limited / Macrotech Developers Limited has NOT been run.

Other projects

Lodha Belmondo, Maval, PuneLodha Panache, PuneLodha Kharadi Pune Phase IIPalava City, Mumbai Metropolitan RegionWorld One, Mumbai

Get the free Property Engineer report on Lodha Sylvan

Title and approvals, DP and survey verification, a 15-year builder search, registered sale agreements from the last six months, and area growth analysis — written for you, not for the developer. No cost, no obligation.

Ask about this project

We collect your name, phone number and the requirements you describe to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Questions

Lodha Sylvan — buyer questions answered

The questions buyers actually ask about Lodha Developers (Macrotech Developers Limited) before paying a booking amount, answered from what we have checked on Lodha Sylvan in Hinjawadi. Where we have not verified something, the answer says so rather than guessing.

Builder credibility, legal standing & approvals

The questions buyers ask before trusting a developer with a booking amount. Answered from what we have verified — and where we have not verified something, it says so.

Lodha Sylvan in Hinjawadi, Pune is registered with MahaRERA under number Seven registrations published — PR1260002502131, PR1260002502408, PR1260002502618, PR1260002502575, PR1260002502581, PR1260002502578, PR1260002502576 — which tower each covers is not published (see cons). A further, unrelated number, PM1260002501593, appears on one source only.. A registration number on its own is not proof that the registration is still live: the MahaRERA portal shows the registered completion date, the current status and any extensions applied for, and that is what to check. The date filed with MahaRERA for this project is Dec 2030. Confirm the number against the portal before you pay anything, including a booking amount. Verify on the MahaRERA portal

Lodha Developers (Macrotech Developers Limited) reports 46 years in the business, 91 projects, building since 1980. Named earlier work includes Lodha Belmondo, Maval, Pune, Lodha Panache, Pune, Lodha Kharadi Pune Phase II, Palava City, Mumbai Metropolitan Region and 1 more. Lodha is India's largest real estate developer by pre-sales, trading corporately as Macrotech Developers Limited (incorporated 1995, NSE- and BSE-listed since its April 2021 IPO) and renamed Lodha Developers Limited in June 2025. As of its last disclosed milestone the group had completed 91 projects totalling 77.22 million sq ft, with a substantial share in the affordable segment alongside its premium Mumbai portfolio, and now runs an active pipeline across the Mumbai Metropolitan Region and Pune, including Lodha Belmondo, Lodha Panache and the Kharadi Pune Phase II towers. This is the only publicly listed, nationally scaled developer in our coverage, and its scale is real: audited consolidated financials, exchange disclosure obligations and a much larger legal and compliance function than any regional builder we track. Two things temper that scale. First, a family governance dispute among the Lodha brothers over the group's structure was reported and resolved in 2025 — resolved rather than ongoing, but worth knowing the group has had one. Second, and more directly relevant to a buyer here, MahaRERA has two live 2026 matters naming Lodha Developers Limited in Pune specifically: an adverse finding on refuge-floor documentation and excess maintenance billing at Lodha Belmondo, and a dismissed-but-contested dispute over agreement signing at Lodha Kharadi Pune Phase II where the developer moved to a Final Notice before Termination against the buyer. Neither is a structural defect finding of the kind recorded against Krisala in our other listings, but both show a company that will enforce its own paperwork and timelines assertively. Separately, three Lodha-linked entities in Thane are reported seeking voluntary project deregistration, a corporate signal unrelated to Pune but worth tracking. We score Lodha Developers (Macrotech Developers Limited) 88 out of 100 on track record, assessed from public records rather than from the developer's own material. Figures a developer publishes about itself are claims until checked, and where two sources disagree we score the more conservative one.

No litigation is disclosed against Lodha Sylvan in the records we have checked. No litigation is disclosed against Lodha Sylvan itself, and `litigation` is set false accordingly. The promoter nonetheless carries two live, named MahaRERA matters in Pune during 2026. In April 2026 MahaRERA directed Lodha Developers Limited to provide certified clarification of the legal status of a flat allegedly on a refuge floor and to refund excess maintenance charges levied before possession, in a dispute over Lodha Belmondo, Maval. In May 2026 MahaRERA dismissed a homebuyer's complaint against Lodha Developers Limited concerning Lodha Kharadi Pune Phase II Tower 8 as premature and not maintainable, after the developer argued the complaint was filed to delay signing the Agreement for Sale and issued a Final Notice before Termination; the buyer had booked a ₹1.49 crore apartment in March 2025. Neither matter concerns this project. Separately, three Lodha/Palava Dwellers projects in Thane are reported as seeking voluntary deregistration. Our own 15-year civil and criminal search on Lodha Developers Limited / Macrotech Developers Limited has NOT been run. "None on record" means none found in what we searched — it is not a guarantee that none exists. Civil, consumer, RERA and NCLT matters sit in different registries, and a fresh search before you pay is worth the hour it takes.

On Lodha Sylvan specifically there is already a gap between the two dates: Lodha Developers (Macrotech Developers Limited) is quoting December 2029, while the date committed to MahaRERA is December 2030 — 12 months later. The RERA date is the one that carries legal weight, and it is the one to plan around. We do not publish a completed-versus-promised delivery history for Lodha Developers (Macrotech Developers Limited)'s earlier projects on this page. That history is reconstructed from the MahaRERA filings of each past project — the registered completion date against the occupancy certificate date — and we do it as part of the free report on this project rather than repeating a claim.

We do not publish resident reviews for Lodha Developers (Macrotech Developers Limited), and we would treat any we found with caution: review sections on property portals are routinely seeded by developers and by competitors, so a rating there is weak evidence either way. What is worth doing is talking to the society office or a few residents at a completed Lodha Developers (Macrotech Developers Limited) project — handover delays, water supply, seepage in the first monsoon and how maintenance was transitioned are all things people will tell you in person and will not write online. We arrange those conversations as part of an advisory engagement; ask us for the list.

Seven MahaRERA registrations are published for Lodha Sylvan — PR1260002502131, PR1260002502408, PR1260002502618, PR1260002502575, PR1260002502581, PR1260002502578 and PR1260002502576 — corroborated identically by two independent sources, with a further unrelated number, PM1260002501593, appearing once and matching none of the seven. PRIORITY BEFORE PUBLICATION: (a) read all seven MahaRERA filings directly, confirm the promoter entity on each (expected to be Lodha Developers Limited or a Macrotech Developers subsidiary, but this must be checked rather than assumed), and establish which registration covers which tower — this is the single most important unresolved fact on this page; (b) reconcile the floor count, published as G+30, G+22 and roughly G+35 (36 total floors) across four sources, and confirm the sanctioned floor count for the specific tower being sold; (c) reconcile flats per floor and lift count — 4 flats on 3 to 4 lifts against 6 flats on 2 lifts on a single outlying source — for the specific tower; (d) reconcile the total unit count, published as 1,062 and as approximately 1,200, neither of which multiplies out against any published combination of tower count, floor count and flats-per-floor; (e) establish which of the sixteen planned towers (T1 through T16) are actually open for booking today — only T1, T2 and T13 through T16 are named anywhere in the public record, against a claimed eleven towers in current release; (f) obtain the survey number and 7/12 extract, and settle the correct address — Megapolis Circle, Hinjewadi Phase 3, is corroborated by three sources and by landmarks every source agrees on; the Gahunje/St Tukaram Nagar address on one microsite matches our existing Goyal My Home Sanctuary listing almost verbatim and should be treated as a copied error unless independently proven otherwise; (g) run our own 15-year civil and criminal search on Lodha Developers Limited / Macrotech Developers Limited, and separately read in full the April 2026 MahaRERA order on the Lodha Belmondo refuge-floor and maintenance-refund matter and the May 2026 order dismissing a buyer's complaint on Lodha Kharadi Pune Phase II, neither of which touches this project but both of which describe how this promoter behaves in a dispute. ALSO OUTSTANDING: room-by-room dimensions for all four layouts, published nowhere; a consolidated floor-plan PDF and brochure for floorPlanUrl and brochureUrl, which exist only behind Lodha's or a channel partner's own lead-capture form and are deliberately left unset here rather than sending a buyer through a competitor's form; project photography; and an official walkthrough video. PRICING PROVENANCE: unitPlans.allInclusivePrice is the Housiey table; unitPlans.quotedPrice records the lower "onwards" figures published elsewhere for the same carpet areas, which is the expected direction (onwards precedes inclusions) rather than the inverted pattern seen on some other listings in this folder — do not treat either as final. A fourth configuration, a 4 BHK at 2,700 sq ft including penthouses, appears on one source only and is excluded from unitPlans as unconfirmed. HINJEWADI PHASE 3 IS A NEW MICRO-MARKET FOR US: appreciationRate (6% a year) and the rental bands are derived fresh from the 99acres Phase 3 series and published Metro Line 3 appreciation estimates, not carried from an existing row, and need a broker check before publication. Distances marked with the approximate symbol are estimates; the 900 m, 1.1 km and 3.1 km figures are as published by Housiey. Pin the map location and re-run Auto-fill nearby. The plot is recorded under Not published. The corroborated address is near Megapolis Circle, MIDC Phase 3 Road, Hinjewadi Phase 3 — not the Gahunje/St Tukaram Nagar address given on one developer-facing microsite, which is almost certainly copied from an unrelated Mamurdi listing.. Zoning on record is Not yet verified against the PMRDA / MIDC Hinjewadi Phase 3 Development Plan. A clear title means the 30-year search shows an unbroken ownership chain, no subsisting mortgage beyond the disclosed construction finance, no injunction, and 7/12 or property-card entries that match the promoter named in the RERA filing. Ask for the title certificate and the search report — both are documents the developer already holds, and a reluctance to share them is itself an answer.

The documents we have sighted for Lodha Sylvan are: Commencement Certificate, Legal Title Report, Layout Plan, Proforma Allotment Letter, Proforma Sale Agreement. On the Development Plan, road reservations affecting the plot: Not yet verified — the client's brief states a ~24 m DP road frontage; check this against the sanctioned road-widening line before relying on it. The set to insist on is the commencement certificate, the sanctioned building plans and layout, the environmental clearance where the plot size requires one, the fire NOC, and — for a completed building — the occupancy certificate. Ask for the commencement certificate specifically: construction that has started without one is the single most common approval defect in Pune.

We do not have the funding model for Lodha Sylvan on record. Funding matters more than turnover for a buyer: a self-funded project stops when sales stop, while a debt-funded one carries a lender with a charge over the land, and a stalled project with a mortgage on it is far harder to unwind. You can check this yourself — the charges registered against a developer are public on the MCA portal, and the RERA filing lists the project's own financing. Insolvency proceedings, if any, appear on the NCLT and IBBI sites. Check company filings on the MCA portal

We do not publish a MahaRERA complaint history for Lodha Developers (Macrotech Developers Limited) on this page, and you should not assume the absence of one here means there are none. Complaints are filed under Section 31 of the Real Estate (Regulation and Development) Act, 2016, and MahaRERA publishes both the complaint register and the orders passed. Search the developer's name and each of its project registration numbers — companies often build under a different registered entity per project, which is why searching only the brand name misses cases. The pattern matters more than the count: several orders on the same complaint type across different projects says more than one contested case. Search complaints and orders on MahaRERA

We have not published a defect history for Lodha Developers (Macrotech Developers Limited)'s completed projects, and we will not infer one from a score. On Lodha Sylvan the structure is recorded as Mivan / aluminium formwork technology, RCC monolithic structure, which tells you the method but not the workmanship. Under Section 14(3) of the RERA Act the promoter is liable for structural defects and defects in workmanship, quality or services for five years from handover, and must rectify them within 30 days of being told, at no cost to you. The practical test is a visit to a Lodha Developers (Macrotech Developers Limited) building two or three monsoons old: look at ceiling corners in the top-floor flats, the parking podium, and the external wall on the weather side.

No survey number is published anywhere, which is the main blocker on this section. It is also the only way to resolve which of the seven RERA registrations governs the specific plot and tower being sold, and to check the true land area (14.85 versus 15 acres) against the 7/12 extract. Future Development Plan proposals recorded for this area: Metro Line 3 (Hinjewadi–Shivajinagar) serves this phase; confirm the alignment and the nearest station against the plot boundary once the map location is pinned. Section 14 of the RERA Act binds the promoter to the sanctioned plans and specifications, and forbids alterations to the sanctioned plan of a building without the written consent of at least two-thirds of the allottees. To check Lodha Sylvan yourself, compare the sanctioned layout attached to the MahaRERA filing against what is standing on site — floor count, tower positions, setbacks and the open space are the things that move. Unauthorised construction is not merely a paperwork problem: it can block the occupancy certificate for the whole building, including flats that were built exactly as approved.

Under Section 18 of the RERA Act, if the promoter fails to hand over by the date in your agreement you may either withdraw and claim a full refund with interest, or stay in the purchase and claim interest for every month of delay until you get possession. The remedy is yours to choose, not the developer's. The date that counts is the one in your agreement for sale, which is why the MahaRERA-committed date for Lodha Sylvan — Dec 2030 — matters more than any date quoted verbally. Check what your draft agreement says about compensation before signing: developer-drafted clauses routinely offer a token per-square-foot amount far below the statutory interest, and a clause cannot take away a right the Act gives you.

We do not record industry-association membership for Lodha Developers (Macrotech Developers Limited), because it is weak evidence. CREDAI and NAREDCO are voluntary trade bodies, not regulators: membership is not an approval, it is not a quality certification, and it cannot be relied on the way a RERA registration can. If it matters to you, both bodies publish member directories for their Pune chapters and you can check the name there in a minute. Weigh it well below the RERA filing, the title search and the delivery history.

Everything below is public and free. On the MCA portal, "View Company Master Data" gives you the registered entity behind Lodha Developers (Macrotech Developers Limited), its incorporation date, paid-up capital and status; the signatory list gives you the directors, and each director's DIN shows every other company they run — which is how you find the sister companies a group builds through. Charges registered against the company show who has lent against what. On MahaRERA, searching the promoter name lists every project it has registered, with the committed and revised completion dates for each. The RERA filing for Lodha Sylvan names the promoter entity; check that it is the same company whose track record you have been reading about, because the marketing brand and the registered promoter are frequently not the same. Look up the company on the MCA portal

Lodha Sylvan is marketed with Lap Pool, Vitality Pool, Kids' Pool with Parent's Deck, Clubhouse, Wellness Spa and 16 more. What binds the developer is the amenity list in the agreement for sale and in the MahaRERA filing — not the brochure, not the render, and not the show flat. Section 11 of the RERA Act requires the promoter to deliver the amenities as declared to the authority, and the agreement is the document a court reads. Before signing, check each amenity you are paying for appears in the agreement's specification annexure with a delivery stage attached. Anything described as "proposed", "planned" or shown only in a render is not a commitment, and a clubhouse promised for "phase 2" of a multi-phase project may be years behind your handover.

Prices, possession & buying process

The practical detail on this project.

Lodha Developers (Macrotech Developers Limited)'s target for Lodha Sylvan is December 2029. The date committed in the MahaRERA filing is December 2030. Where the two differ, the RERA date is the one that carries legal weight and the one to plan your rent or loan around.

Lodha Sylvan offers 2 BHK and 3 BHK homes with carpet areas from 836 to 1428 sq ft. These are RERA carpet areas — the usable floor area inside your walls — not built-up or super built-up, which is what quoted rates on portals are usually based on. Compare projects on carpet area or the comparison is meaningless.

All-inclusive prices at Lodha Sylvan run ₹1.10 Cr – ₹2.21 Cr, depending on configuration and floor. Payments follow a CLP (Construction Linked Plan): Standard slab-wise payment against construction progress. A separate booking amount of ₹1.8 Lacs on the 2 BHK and ₹2.7 Lacs on the 3 BHK is reported on one source ahead of the full minimum down payment of ₹17.00 Lacs quoted elsewhere — establish which figure is the genuine booking token and which is the down payment before paying anything. Approved with State Bank of India, HDFC Bank, ICICI Bank, Axis Bank, Kotak Mahindra Bank, Citi Bank, Bank of Baroda, Bank of India, Union Bank of India and Central Bank of India. Ask for the cost sheet in writing: stamp duty, registration, GST where applicable, floor-rise, parking and the maintenance deposit are frequently quoted separately from the headline price.

Home loans of up to 90 per cent are indicated under the developer's payment scheme for Lodha Sylvan. Individual lender panels vary, and a project being "bank approved" in a brochure means one bank has done its own legal check — not that yours will. We confirm the current lender panel as part of our advisory work rather than repeating the developer's claim. A bank's own legal team declining a project is a signal worth knowing about.

Yes. NRIs and OCI cardholders may buy residential property in India under RBI rules, with payments routed through NRE or NRO accounts and no special permission needed for a residential purchase. We handle documentation, power of attorney and remote signing for buyers of Lodha Sylvan from outside India as part of an advisory engagement. Call +91 93738 11941 or write to hello@propertyengineer.in.