← All properties
Early Stage / Under ConstructionNo litigation on record

Legacy Highpoint

by Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) · Punawale, Pune

₹75.60 Lacs – ₹90.27 Lacs

Legacy Highpoint photograph 1
Legacy Highpoint photograph 2
Legacy Highpoint photograph 3
Legacy Highpoint photograph 4
Legacy Highpoint photograph 5
Legacy Highpoint photograph 6
Legacy Highpoint photograph 7
Photo 1 of 7

Land parcel

~2 acres, per the client brief — not independently corroborated

Towers / Floors

2 towers · Ground + 2 Podium + 26 residential floors (G+2P+26), per the client brief — not independently corroborated

Configurations

2 BHK

Carpet area

667–754 sqft

RERA number

PM1260002601788

Possession status

Early Stage / Under Construction

Target possession

December 2029

Litigation

None on record

Property Engineer Verdict

Our composite score for Legacy Highpoint across legal standing, builder record, livability, connectivity and value — plus the buy, wait or walk-away call.

Free. One call from an advisor, never sold on.

Overview

About the project

Legacy Highpoint (developed by Legacy Lifespaces under Infinitynx Realtors LLP) is an exclusive residential high-rise development situated on a ~2.0-acre land parcel along Kate Wasti Road in Punawale, West Pune. Thoughtfully designed for urban families and IT professionals working in the nearby Hinjewadi tech corridor, the project features two 26-storey towers offering premium 2 BHK residences ranging from 666 to 755 sq. ft. carpet area. Every residence features MIVAN aluminium formwork construction, dual main balconies, a dedicated kitchen dry balcony, 5 elevators per tower, and access to over 21 lifestyle and rooftop amenities. लेगसी हायपॉईंट (इन्फिनिटीएनएक्स रियल्टर्स एलएलपी अंतर्गत लेगसी लाईफस्पेसेसद्वारे विकसित) हा पश्चिम पुण्यातील पुनावळे येथील काटे वस्ती रस्त्यालगत सुमारे २.० एकर भूखंडावर वसलेला एक विशेष निवासी उंच इमारत प्रकल्प आहे. जवळच्या हिंजवडी टेक कॉरिडॉरमध्ये काम करणाऱ्या शहरी कुटुंबांसाठी आणि आयटी व्यावसायिकांसाठी विचारपूर्वक डिझाइन केलेल्या या प्रकल्पात दोन २६-मजली ​​टॉवर्स असून, त्यांमध्ये ६६६ ते ७५५ चौरस फूट कार्पेट एरियाची प्रीमियम २ बीएचके निवासस्थाने उपलब्ध आहेत. प्रत्येक निवासस्थानात मिवान ॲल्युमिनियम फॉर्मवर्क बांधकाम, दोन मुख्य बाल्कनी, स्वयंपाकघरासाठी स्वतंत्र ड्राय बाल्कनी, प्रत्येक टॉवरमध्ये ५ लिफ्ट आणि २१ हून अधिक जीवनशैली व रूफटॉप सुविधांचा लाभ मिळतो.

Near 18 Longitude Mall, Kate Wasti Road, Punawale, Pune West

Developer's official project page

Nearby landmarks

  • 18 Longitude MallAdjacent
  • Mumbai–Bengaluru Highway (NH-48)Direct connectivity claimed, per the client brief — distance not independently verified
  • Kate Wasti main roadDirect connectivity claimed, per the client brief
  • LandMark Hospitals507.7 km

See it

Walkthrough & location

Developer walkthrough, published as issued.Watch on their site
Map showing the location of Legacy Highpoint, Sr. No. 16(P, Kate Wasti Rd, near 18 Longitude Mall, Kate Wasti, Punawale, Pimpri-Chinchwad, Maharashtra 411033, India
Sr. No. 16(P, Kate Wasti Rd, near 18 Longitude Mall, Kate Wasti, Punawale, Pimpri-Chinchwad, Maharashtra 411033, IndiaOpen in Google Maps

The neighbourhood

What is around the project

Facing road to the societyDescribed as 18–24 m DP road access with direct connectivity to the Kate Wasti main road and the Mumbai–Bengaluru Highway, per the client brief — not independently verified— the wider the approach road, the easier access stays as the area builds out.

  • Hinjawadi Rajiv Gandhi Infotech Park, Phase 14km
  • PANCHSHIL EON IT PARK2km
  • Embassy Tech Zone2.6 km
  • International Tech Park Pune6.3 km

  • One Nest Preschool Punawale50 m
  • Tatva Pre-Schools Punawale150 m
  • Podar School (Proposed CBSE) Punawale600 m
  • Vedh Valley World CBSE School, Wakad1.5 km
  • ORCHIDS The International School - Tathawade CBSE - Affiliation No. 11314472.7 km
  • EuroSchool Wakad - CBSE School2.8 km

  • Indira University2.2 km
  • Alard University Pune2.2 km
  • Sri Balaji University, Pune (SBUP)2.9 km
  • D. Y. Patil International University3.6 km
  • Symbiosis International (Deemed University)10.0 km

  • Legacy Milestone, Punawale — same developer, different registration (P52100077968)Same locality
  • Legacy Ekam, Punawale — same developer (PM1260002502297)Same locality
  • Legacy Twin Arcs Phase 2, Punawale — same developerSame locality
  • Garve Akshara Grandeur, PunawaleSame locality
  • Yashada Evo Residences, PunawaleSame locality
  • The Province100 m
  • Smruti Garden550 m
  • Auralia Residency850 m
  • Palladio Apartment2.2 km
  • Akshar Elementa2.6 km
  • Siddhi Nisarg Housing Society Ltd2.8 km

Our read

Pros & cons

Pros & cons

The strengths and the drawbacks we found, written as plainly as each other.

Free. One call from an advisor, never sold on.

Build quality

Structure & specification

Construction type

Mivan / RCC aluminium formwork technology

Ceiling height

~9.5–10 ft clear floor-to-ceiling, per the client brief

Flats per floor

8

Lifts per tower

5 high-speed elevators and 2 staircases per tower, per the client brief — not independently corroborated

Parking levels

Ground + 2 podium parking levels, per the client brief

Parking per flat

1 covered parking space per flat

Balconies

2 balconies per layout — living room balcony and bedroom balcony

Dry balcony

1 dedicated dry utility space attached to the kitchen

Specification

Amenities

Internal

Vitrified Tile Flooring in living, dining, kitchen and bedroomsAnti-skid Ceramic/Vitrified Tiles in toilets, balconies and dry utility spaceBiometric Main-Door Lock and Digital Lock on Entrance DoorVideo Door Phone and Smart DoorbellSmart Switch PointsBranded CP and Sanitary Fittings, Wall-Hung EWCsConcealed Thermostatic DivertersDesigner Ceramic Tile Dado up to Lintel HeightPremium Granite Kitchen Platform with Stainless Steel SinkWater Purifier Point and Exhaust Fan ProvisionPowder-Coated Aluminium Sliding Windows with Mosquito Mesh and Safety GrillsGranite Window SillsConcealed Fire-Resistant Copper Wiring with Modular SwitchesAC Points in Living Room and BedroomsTV / Data PointsIn-Flat Power Backup up to 2 kVA, plus Common-Area DG Backup

External

ClubhouseSwimming PoolKids' PoolFitness Studio / GymnasiumIndoor Games RoomMusic StudioSports CourtsYoga / Meditation SpaceRooftop Sky Lounge and Stargazing Terrace DeckRooftop Sit-OutsGrand Double-Height Entrance Lobby with Waiting Lounge in Each TowerKids' LibraryParty LawnSenior Citizen Seating ZonesEV Charging Provisions3-Tier Security with 24/7 CCTV SurveillanceSolar Water Heater SystemRainwater HarvestingSewage Treatment Plant (STP)

Costs

Pricing & unit plans

ConfigurationCarpet areaAll-inclusive priceMin. down paymentFloor plan
2 BHK667 sqft₹75.60 LacsNot published—
2 BHK754 sqft₹90.27 LacsNot published—

Maintenance charges

  • 2 BHKNot published

Payment scheme

CLP (Construction Linked Plan)

Per the client brief: 10 percent on booking, 10 percent on agreement registration, milestone-based slab payments during construction, and the balance on possession. No bank panel or subvention scheme details were independently found; get both the payment schedule and the approved-lender list in writing before booking.

Pricing intelligence

The quoted price is where the conversation starts.

Legacy Highpoint is quoted at ₹75.60 Lacs – ₹90.27 Lacs. Tell us where to reach you and we will send the closable price — plus how it stacks up against the projects around it.

  • Comparative pricing against nearby projects, per square foot
  • The price this project actually closes at, not the quoted one
  • Backed by registered sale agreements from the last six months

Get the closable price

Free, and no obligation to buy through us.

+91

One call from an advisor. Your number is never sold on.

Investment outlook

Appreciation & rental income

Appreciation & rental income

What this micro-market has appreciated at, and the rent a 2 or 3 BHK here actually commands.

Free. One call from an advisor, never sold on.

Handover

Possession & delivery

Build stage

Early Stage / Under Construction

Builder's target

December 2029

RERA committed date

December 2030

Construction complete

0% – 5% (Substructure & Plinth Phase)

Construction funding

Secured Project Financing via Axis Bank (IFSC: UTIB0001641)

The developer is quoting December 2029, but the date it is legally committed to under RERA is December 2030 — 12 months later. Plan around the RERA date; the earlier one carries no penalty if it slips.

Development plan & survey

Survey numbers
Survey No. 16/2/3, 16/2/5, 16/2/9, and 16/3, Punawale, Taluka Mulshi, District Pune
Zoning
Residential Zone (R-Zone) under the Pimpri-Chinchwad Municipal Corporation (PCMC) / PMRDA Development Plan
Road reservations
Not verified. The client brief claims 18 to 24 m DP road access with direct connectivity to the Kate Wasti main road and the Mumbai–Bengaluru Highway; this has not been checked against a sanctioned DP road alignment for this specific plot.
Future DP proposals
Beneficiary of the PCMC Ravet–Punawale infrastructure plan, including local DP road widening and proximity to proposed inner ring road interchanges.
DP remarks
Commencement Certificate (CC): CC issued on 23/06/2026 to Infinitynx Realtors LLP. Sanctioned Scope: Current approved CC covers 16 floors (14 habitable levels / 135 units) for Building A and 6 floors (4 habitable levels / 54 units) for Building B, totaling 189 sanctioned units[cite: 8]. (Further floor approvals to be issued progressively as construction advances). Financial Encumbrance: Declared project financing/bank mortgage registered with Axis Bank on MahaRERA portal[cite: 11, 12].

Due diligence

Legal & litigation

MahaRERA registration

PM1260002601788

Verify on the official MahaRERA portal

Litigation status

No litigation on record

Paperwork

Documents

Paperwork & documents

The title, approval and layout documents we hold on this project, and how to request copies.

Free. One call from an advisor, never sold on.

Developer

Builder profile

Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm)

Building since

2007 (the brief says 2006; independent search results consistently give 2007)

Years of experience

19

Total projects

30

Cities of operation

Pune

Our builder grade

B Cat (provisional — core structural claims for this specific project unverified)

Legacy Lifespaces LLP has built across Rahatani, Punawale, Wakad and Ravet since 2007. It runs an unusually large concurrent pipeline — at least ten actively marketed projects under the Legacy brand at once, including this one — which is both a sign of scale and the reason sibling-project confusion is a real risk for any buyer researching this specific project online. Its own site publishes no dated completed-projects list and shows placeholder statistics for years, projects and families served; claimed figures elsewhere range from 18-plus to 37-plus years and 30-plus to 37-plus projects. Two live 2025 MahaRERA advertisement-disclosure cases are recorded in full in builderLitigationSummary.

Background

Legacy Lifespaces LLP has been building in the Rahatani–Punawale–Wakad–Ravet belt of PCMC since 2007, with a named current pipeline of at least ten concurrently marketed projects — Legacy Highpoint, Legacy Milestone, Legacy Ekam, Legacy Twin Arcs Phase 2, Legacy Crest, Legacy Urbania, Legacy Millenia, Legacy Liva, Legacy Kairos (Rahatani) and The Statement (Pimple Saudagar) — plus Aqualife in Ravet. That is an unusually wide concurrent pipeline for a regional developer, and it is the practical reason this project is so easy to confuse with its own siblings: at least one sibling listing, titled simply \"Legacy Punawale\" on a public portal, carries no RERA registration at all. Published claims of experience vary: the company's own site shows placeholder zeros for years, projects and families served; one search summary gives 37-plus running projects; another gives 30-plus delivered; the client brief gives 18-plus years and 30-plus projects. The company carries two live 2025 MahaRERA Suo Motu/Advertisement cases, recorded in full in builderLitigationSummary. No structural defect or fraud finding against the group surfaced in this research pass, but our own 15-year civil and criminal search has not been run.

15-year litigation search on the developer

Developer Entity: Infinitynx Realtors LLP[cite: 2] (Promoter group: Legacy Lifespaces)[cite: 3, 13]. Track Record: No major civil or criminal proceedings, stays, or insolvency matters recorded against the LLP or designated partners over the past 15 years in public legal repositories and MahaRERA filings[cite: 3, 13]. Legacy Lifespaces maintains an 18+ year regional track record with 30+ completed and ongoing projects across Pune.

Other projects

Legacy Milestone, Punawale (P52100077968)Legacy Ekam, Punawale (PM1260002502297)Legacy Twin Arcs Phase 2, PunawaleLegacy Crest, PunawaleLegacy Kairos, RahataniThe Statement, Pimple SaudagarAqualife, Ravet

Get the free Property Engineer report on Legacy Highpoint

Title and approvals, DP and survey verification, a 15-year builder search, registered sale agreements from the last six months, and area growth analysis — written for you, not for the developer. No cost, no obligation.

Ask about this project

We collect your name, phone number and the requirements you describe to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Questions

Legacy Highpoint — buyer questions answered

The questions buyers actually ask about Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) before paying a booking amount, answered from what we have checked on Legacy Highpoint in Punawale. Where we have not verified something, the answer says so rather than guessing.

Builder credibility, legal standing & approvals

The questions buyers ask before trusting a developer with a booking amount. Answered from what we have verified — and where we have not verified something, it says so.

Legacy Highpoint in Punawale, Pune is registered with MahaRERA under number PM1260002601788. A registration number on its own is not proof that the registration is still live: the MahaRERA portal shows the registered completion date, the current status and any extensions applied for, and that is what to check. The date filed with MahaRERA for this project is Dec 2030. Confirm the number against the portal before you pay anything, including a booking amount. Verify on the MahaRERA portal

Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) reports 19 years in the business, 30 projects, building since 2007 (the brief says 2006; independent search results consistently give 2007). Named earlier work includes Legacy Milestone, Punawale (P52100077968), Legacy Ekam, Punawale (PM1260002502297), Legacy Twin Arcs Phase 2, Punawale, Legacy Crest, Punawale and 3 more. Legacy Lifespaces LLP has been building in the Rahatani–Punawale–Wakad–Ravet belt of PCMC since 2007, with a named current pipeline of at least ten concurrently marketed projects — Legacy Highpoint, Legacy Milestone, Legacy Ekam, Legacy Twin Arcs Phase 2, Legacy Crest, Legacy Urbania, Legacy Millenia, Legacy Liva, Legacy Kairos (Rahatani) and The Statement (Pimple Saudagar) — plus Aqualife in Ravet. That is an unusually wide concurrent pipeline for a regional developer, and it is the practical reason this project is so easy to confuse with its own siblings: at least one sibling listing, titled simply \"Legacy Punawale\" on a public portal, carries no RERA registration at all. Published claims of experience vary: the company's own site shows placeholder zeros for years, projects and families served; one search summary gives 37-plus running projects; another gives 30-plus delivered; the client brief gives 18-plus years and 30-plus projects. The company carries two live 2025 MahaRERA Suo Motu/Advertisement cases, recorded in full in builderLitigationSummary. No structural defect or fraud finding against the group surfaced in this research pass, but our own 15-year civil and criminal search has not been run. We score Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) 80 out of 100 on track record, assessed from public records rather than from the developer's own material. Figures a developer publishes about itself are claims until checked, and where two sources disagree we score the more conservative one.

No litigation is disclosed against Legacy Highpoint in the records we have checked. Developer Entity: Infinitynx Realtors LLP[cite: 2] (Promoter group: Legacy Lifespaces)[cite: 3, 13]. Track Record: No major civil or criminal proceedings, stays, or insolvency matters recorded against the LLP or designated partners over the past 15 years in public legal repositories and MahaRERA filings[cite: 3, 13]. Legacy Lifespaces maintains an 18+ year regional track record with 30+ completed and ongoing projects across Pune. "None on record" means none found in what we searched — it is not a guarantee that none exists. Civil, consumer, RERA and NCLT matters sit in different registries, and a fresh search before you pay is worth the hour it takes.

On Legacy Highpoint specifically there is already a gap between the two dates: Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) is quoting December 2029, while the date committed to MahaRERA is December 2030 — 12 months later. The RERA date is the one that carries legal weight, and it is the one to plan around. We do not publish a completed-versus-promised delivery history for Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm)'s earlier projects on this page. That history is reconstructed from the MahaRERA filings of each past project — the registered completion date against the occupancy certificate date — and we do it as part of the free report on this project rather than repeating a claim.

We do not publish resident reviews for Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm), and we would treat any we found with caution: review sections on property portals are routinely seeded by developers and by competitors, so a rating there is weak evidence either way. What is worth doing is talking to the society office or a few residents at a completed Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) project — handover delays, water supply, seepage in the first monsoon and how maintenance was transitioned are all things people will tell you in person and will not write online. We arrange those conversations as part of an advisory engagement; ask us for the list.

No active litigation, court disputes, or regulatory complaints are filed on record for this project registration The plot is recorded under Survey No. 16/2/3, 16/2/5, 16/2/9, and 16/3, Punawale, Taluka Mulshi, District Pune. Zoning on record is Residential Zone (R-Zone) under the Pimpri-Chinchwad Municipal Corporation (PCMC) / PMRDA Development Plan. A clear title means the 30-year search shows an unbroken ownership chain, no subsisting mortgage beyond the disclosed construction finance, no injunction, and 7/12 or property-card entries that match the promoter named in the RERA filing. Ask for the title certificate and the search report — both are documents the developer already holds, and a reluctance to share them is itself an answer.

The documents we have sighted for Legacy Highpoint are: MahaRERA Registration Certificate: Reg. No. PM1260002601788 (Registration Date: 04/09/2026), Legal Title Search Report: Comprehensive title search report uploaded on 04/08/2026 confirming clear title, Commencement Certificate (CC): Authority CC approval Order dated 23/06/2026, Land Ownership Documents: 7/12 Extracts for Survey Nos. 16/2/3, 16/2/5, 16/2/9, and 16/3, Approved Sanction Plans: Layout and floor plans sanctioned for Building A & Building B, Proforma Sales Legal Agreement: Standardized Agreement for Sale and Allotment Letter deviation reports and 1 more. On the Development Plan, road reservations affecting the plot: Not verified. The client brief claims 18 to 24 m DP road access with direct connectivity to the Kate Wasti main road and the Mumbai–Bengaluru Highway; this has not been checked against a sanctioned DP road alignment for this specific plot.. The set to insist on is the commencement certificate, the sanctioned building plans and layout, the environmental clearance where the plot size requires one, the fire NOC, and — for a completed building — the occupancy certificate. Ask for the commencement certificate specifically: construction that has started without one is the single most common approval defect in Pune.

Construction on Legacy Highpoint is recorded as Secured Project Financing via Axis Bank (IFSC: UTIB0001641). Funding matters more than turnover for a buyer: a self-funded project stops when sales stop, while a debt-funded one carries a lender with a charge over the land, and a stalled project with a mortgage on it is far harder to unwind. You can check this yourself — the charges registered against a developer are public on the MCA portal, and the RERA filing lists the project's own financing. Insolvency proceedings, if any, appear on the NCLT and IBBI sites. Check company filings on the MCA portal

We do not publish a MahaRERA complaint history for Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) on this page, and you should not assume the absence of one here means there are none. Complaints are filed under Section 31 of the Real Estate (Regulation and Development) Act, 2016, and MahaRERA publishes both the complaint register and the orders passed. Search the developer's name and each of its project registration numbers — companies often build under a different registered entity per project, which is why searching only the brand name misses cases. The pattern matters more than the count: several orders on the same complaint type across different projects says more than one contested case. Search complaints and orders on MahaRERA

We have not published a defect history for Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm)'s completed projects, and we will not infer one from a score. On Legacy Highpoint the structure is recorded as Mivan / RCC aluminium formwork technology, which tells you the method but not the workmanship. Under Section 14(3) of the RERA Act the promoter is liable for structural defects and defects in workmanship, quality or services for five years from handover, and must rectify them within 30 days of being told, at no cost to you. The practical test is a visit to a Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm) building two or three monsoons old: look at ceiling corners in the top-floor flats, the parking podium, and the external wall on the weather side.

Commencement Certificate (CC): CC issued on 23/06/2026 to Infinitynx Realtors LLP. Sanctioned Scope: Current approved CC covers 16 floors (14 habitable levels / 135 units) for Building A and 6 floors (4 habitable levels / 54 units) for Building B, totaling 189 sanctioned units[cite: 8]. (Further floor approvals to be issued progressively as construction advances). Financial Encumbrance: Declared project financing/bank mortgage registered with Axis Bank on MahaRERA portal[cite: 11, 12]. Future Development Plan proposals recorded for this area: Beneficiary of the PCMC Ravet–Punawale infrastructure plan, including local DP road widening and proximity to proposed inner ring road interchanges.. Section 14 of the RERA Act binds the promoter to the sanctioned plans and specifications, and forbids alterations to the sanctioned plan of a building without the written consent of at least two-thirds of the allottees. To check Legacy Highpoint yourself, compare the sanctioned layout attached to the MahaRERA filing against what is standing on site — floor count, tower positions, setbacks and the open space are the things that move. Unauthorised construction is not merely a paperwork problem: it can block the occupancy certificate for the whole building, including flats that were built exactly as approved.

Under Section 18 of the RERA Act, if the promoter fails to hand over by the date in your agreement you may either withdraw and claim a full refund with interest, or stay in the purchase and claim interest for every month of delay until you get possession. The remedy is yours to choose, not the developer's. The date that counts is the one in your agreement for sale, which is why the MahaRERA-committed date for Legacy Highpoint — Dec 2030 — matters more than any date quoted verbally. Check what your draft agreement says about compensation before signing: developer-drafted clauses routinely offer a token per-square-foot amount far below the statutory interest, and a clause cannot take away a right the Act gives you.

We do not record industry-association membership for Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm), because it is weak evidence. CREDAI and NAREDCO are voluntary trade bodies, not regulators: membership is not an approval, it is not a quality certification, and it cannot be relied on the way a RERA registration can. If it matters to you, both bodies publish member directories for their Pune chapters and you can check the name there in a minute. Weigh it well below the RERA filing, the title search and the delivery history.

Everything below is public and free. On the MCA portal, "View Company Master Data" gives you the registered entity behind Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm), its incorporation date, paid-up capital and status; the signatory list gives you the directors, and each director's DIN shows every other company they run — which is how you find the sister companies a group builds through. Charges registered against the company show who has lent against what. On MahaRERA, searching the promoter name lists every project it has registered, with the committed and revised completion dates for each. The RERA filing for Legacy Highpoint names the promoter entity; check that it is the same company whose track record you have been reading about, because the marketing brand and the registered promoter are frequently not the same. Look up the company on the MCA portal

Legacy Highpoint is marketed with Clubhouse, Swimming Pool, Kids' Pool, Fitness Studio / Gymnasium, Indoor Games Room and 14 more. What binds the developer is the amenity list in the agreement for sale and in the MahaRERA filing — not the brochure, not the render, and not the show flat. Section 11 of the RERA Act requires the promoter to deliver the amenities as declared to the authority, and the agreement is the document a court reads. Before signing, check each amenity you are paying for appears in the agreement's specification annexure with a delivery stage attached. Anything described as "proposed", "planned" or shown only in a render is not a commitment, and a clubhouse promised for "phase 2" of a multi-phase project may be years behind your handover.

Prices, possession & buying process

The practical detail on this project.

Legacy Lifespaces (the client brief states a partnership with Infinitynx Realtors LLP, which we could not independently confirm)'s target for Legacy Highpoint is December 2029. The date committed in the MahaRERA filing is December 2030. Where the two differ, the RERA date is the one that carries legal weight and the one to plan your rent or loan around.

Legacy Highpoint offers 2 BHK homes with carpet areas from 667 to 754 sq ft. These are RERA carpet areas — the usable floor area inside your walls — not built-up or super built-up, which is what quoted rates on portals are usually based on. Compare projects on carpet area or the comparison is meaningless.

All-inclusive prices at Legacy Highpoint run ₹75.60 Lacs – ₹90.27 Lacs, depending on configuration and floor. Payments follow a CLP (Construction Linked Plan): Per the client brief: 10 percent on booking, 10 percent on agreement registration, milestone-based slab payments during construction, and the balance on possession. No bank panel or subvention scheme details were independently found; get both the payment schedule and the approved-lender list in writing before booking. Ask for the cost sheet in writing: stamp duty, registration, GST where applicable, floor-rise, parking and the maintenance deposit are frequently quoted separately from the headline price.

Home loans of up to 90 per cent are indicated under the developer's payment scheme for Legacy Highpoint. Individual lender panels vary, and a project being "bank approved" in a brochure means one bank has done its own legal check — not that yours will. We confirm the current lender panel as part of our advisory work rather than repeating the developer's claim. A bank's own legal team declining a project is a signal worth knowing about.

Yes. NRIs and OCI cardholders may buy residential property in India under RBI rules, with payments routed through NRE or NRO accounts and no special permission needed for a residential purchase. We handle documentation, power of attorney and remote signing for buyers of Legacy Highpoint from outside India as part of an advisory engagement. Call +91 93738 11941 or write to hello@propertyengineer.in.