← All properties
Under Construction (3+ yrs)No litigation on record

Namrata 6 Boulevard

by Namrata Group · Tathawade, Pune

₹95.00 Lacs – ₹1.94 Cr

Namrata 6 Boulevard photograph 1
Namrata 6 Boulevard photograph 2
Namrata 6 Boulevard photograph 3
Photo 1 of 3

Land parcel

5.5 acres

Towers / Floors

6 towers · 2B+G+P+28

Configurations

2 BHK · 3 BHK · 4 BHK

Carpet area

7971538 sqft

RERA number

PR1261012600142

Possession status

Under Construction (3+ yrs)

Target possession

December 2029

Litigation

None on record

Property Engineer Verdict

Our composite score for Namrata 6 Boulevard across legal standing, builder record, livability, connectivity and value — plus the buy, wait or walk-away call.

Free. One call from an advisor, never sold on.

Overview

About the project

Namrata 6 Boulevard is a premium under-construction residential landmark by SMP Namrata Lotus Landmarks LLP (Namrata Group) sprawling across 5.5 acres on the Aundh-Ravet BRTS Road in Tathawade, Pune. The development comprises 6 high-rise towers (2B+G+P+28 floors) offering modern 2 BHK, 3 BHK, and 4 BHK residences with high-end lifestyle amenities.

Located along Aundh-Ravet BRTS Road, Newale Wasti, Tathawade, Pune with rapid connectivity to Hinjewadi Phase 1, Wakad, and NH-48.

Developer's official project page

Nearby landmarks

  • Aundh-Ravet BRTS Road200 m
  • Mumbai-Bengaluru Highway (NH-48)1.0 km
  • Bhumkar Chowk2.2 km
  • Phoenix Mall of the Millennium3.5 km

Project resources

Brochure & floor plans

The developer’s own material. We publish it as issued — read it alongside our analysis above, not instead of it.

See it

Walkthrough & location

Developer walkthrough, published as issued.Watch on their site
Map showing the location of Namrata 6 Boulevard, Survey No. 41/4, 62/4/4 & 62/4/5, Newale Wasti, Aundh-Ravet BRTS Road, Tathawade, Pimpri-Chinchwad, Pune, Maharashtra 411033
Survey No. 41/4, 62/4/4 & 62/4/5, Newale Wasti, Aundh-Ravet BRTS Road, Tathawade, Pimpri-Chinchwad, Pune, Maharashtra 411033Open in Google Maps

The neighbourhood

What is around the project

Facing road to the society100 ft— the wider the approach road, the easier access stays as the area builds out.

  • Eon IT Park Tathawade1.5 km
  • Hinjewadi IT Park Phase 13.5 km
  • International Tech Park Pune (ITPP)6.0 km

  • Lotus Business School800 m
  • Akshara International School1.2 km
  • Podar International School, Tathawade1.5 km
  • Blossom Public School2.0 km

  • JSPM Rajarshi Shahu College of Engineering1.0 km
  • Indira Group of Institutes1.8 km
  • Dr. D. Y. Patil B-School2.2 km

  • Rohan Harita600 m
  • 7 Plumeria Drive800 m
  • The Privve Tathawade1.0 km
  • Rama Metro Life Optima1.2 km

Our read

Pros & cons

Pros & cons

The strengths and the drawbacks we found, written as plainly as each other.

Free. One call from an advisor, never sold on.

Build quality

Structure & specification

Construction type

Mivan Aluminium Formwork Shuttering

Ceiling height

10.0 feet

Flats per floor

4

Lifts per tower

4

Parking levels

2 Basement + Ground + Podium

Parking per flat

1 Covered Space per Unit

Balconies

2

Dry balcony

Dedicated dry balcony attached to kitchen space

Specification

Amenities

Internal

Vitrified Tile FlooringGranite Kitchen Platform with SS SinkWork-from-Home PodsPremium CP & Sanitary FittingsVideo Door PhoneModular Switches

External

Swimming PoolAqua GymHot Spring JacuzziClub HousePickleball Court3-Hole Mini GolfGolf SimulatorFitness GardenRC Car TrackKaraoke RoomReading GardenKids Play AreaEV Charging StationMultipurpose HallCo-Working Pods

Costs

Pricing & unit plans

ConfigurationCarpet areaAll-inclusive priceMin. down paymentFloor plan
2 BHK797 sqft₹95.00 Lacs₹14.00 Lacs
2 BHK817 sqft₹98.00 Lacs₹15.00 Lacs
3 BHK1041 sqft₹1.31 Cr₹19.00 Lacs
3 BHK1139 sqft₹1.48 Cr₹22.00 Lacs
4 BHK1518 sqft₹1.88 Cr₹28.00 Lacs

Maintenance charges

  • 2 BHK₹3,000 – ₹3,300/month
  • 3 BHK₹4,200 – ₹5,200/month
  • 4 BHK₹6,000/month

Payment scheme

CLP (Construction Linked Plan)

Standard slab-wise payment schedule mapped to construction progress with bank home loan approvals up to 90%.

Pricing intelligence

The quoted price is where the conversation starts.

Namrata 6 Boulevard is quoted at ₹95.00 Lacs – ₹1.94 Cr. Tell us where to reach you and we will send the closable price — plus how it stacks up against the projects around it.

  • Comparative pricing against nearby projects, per square foot
  • The price this project actually closes at, not the quoted one
  • Backed by registered sale agreements from the last six months

Get the closable price

Free, and no obligation to buy through us.

+91

One call from an advisor. Your number is never sold on.

Investment outlook

Appreciation & rental income

Appreciation & rental income

What this micro-market has appreciated at, and the rent a 2 or 3 BHK here actually commands.

Free. One call from an advisor, never sold on.

Handover

Possession & delivery

Build stage

Under Construction (3+ yrs)

Builder's target

December 2029

RERA committed date

December 2030

Construction complete

15%

Construction funding

Self Funded / Bank Approved Project

The developer is quoting December 2029, but the date it is legally committed to under RERA is December 203012 months later. Plan around the RERA date; the earlier one carries no penalty if it slips.

Development plan & survey

Survey numbers
Survey No. 41/4, 62/4/4 & 62/4/5
Zoning
R1 Residential
Road reservations
Direct access onto the 100 FT Aundh-Ravet BRTS road with connecting 80 FT DP roads linking Tathawade, Wakad, and Hinjewadi.
Future DP proposals
Positioned within West Pune's prime growth corridor adjacent to Hinjewadi IT Park and EON IT Park Tathawade Phase 2. The upcoming Pune Metro Line 3 extension and BRTS corridor expansion will significantly improve connectivity and property valuation.

Due diligence

Legal & litigation

MahaRERA registration

PR1261012600142

Verify on the official MahaRERA portal

Litigation status

No litigation on record

Paperwork

Documents

Paperwork & documents

The title, approval and layout documents we hold on this project, and how to request copies.

Free. One call from an advisor, never sold on.

Developer

Builder profile

Namrata Group

Building since

1987

Years of experience

39

Total projects

40

Cities of operation

Pune, Pimpri-Chinchwad, Talegaon Dabhade

Our builder grade

A Cat

Namrata Group is a leading real estate developer headquartered in Pune with over 38 years of experience since its founding in 1987. The group has delivered over 40 successful residential and commercial projects across Pune, Talegaon, Rahatani, Baner, and Kamshet.

Other projects

Namrata Amberwood (Rahatani)Namrata Manifesta (Punawale)Namrata Eco City (Talegaon)Namrata Sarvam (Talegaon)Namrata Altura Hills (Baner)

Get the free Property Engineer report on Namrata 6 Boulevard

Title and approvals, DP and survey verification, a 15-year builder search, registered sale agreements from the last six months, and area growth analysis — written for you, not for the developer. No cost, no obligation.

Ask about this project

We collect your name, phone number and the requirements you describe to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Questions

Namrata 6 Boulevard — buyer questions answered

The questions buyers actually ask about Namrata Group before paying a booking amount, answered from what we have checked on Namrata 6 Boulevard in Tathawade. Where we have not verified something, the answer says so rather than guessing.

Builder credibility, legal standing & approvals

The questions buyers ask before trusting a developer with a booking amount. Answered from what we have verified — and where we have not verified something, it says so.

Namrata 6 Boulevard in Tathawade, Pune is registered with MahaRERA under number PR1261012600142. A registration number on its own is not proof that the registration is still live: the MahaRERA portal shows the registered completion date, the current status and any extensions applied for, and that is what to check. The date filed with MahaRERA for this project is Dec 2030. Confirm the number against the portal before you pay anything, including a booking amount. Verify on the MahaRERA portal

Namrata Group reports 39 years in the business, 40 projects, building since 1987. Named earlier work includes Namrata Amberwood (Rahatani), Namrata Manifesta (Punawale), Namrata Eco City (Talegaon), Namrata Sarvam (Talegaon) and 1 more. We score Namrata Group 85 out of 100 on track record, assessed from public records rather than from the developer's own material. Figures a developer publishes about itself are claims until checked, and where two sources disagree we score the more conservative one.

No litigation is disclosed against Namrata 6 Boulevard in the records we have checked. We have not published a separate 15-year civil and criminal search on Namrata Group for this listing. "None on record" means none found in what we searched — it is not a guarantee that none exists. Civil, consumer, RERA and NCLT matters sit in different registries, and a fresh search before you pay is worth the hour it takes.

On Namrata 6 Boulevard specifically there is already a gap between the two dates: Namrata Group is quoting December 2029, while the date committed to MahaRERA is December 2030 — 12 months later. The RERA date is the one that carries legal weight, and it is the one to plan around. We do not publish a completed-versus-promised delivery history for Namrata Group's earlier projects on this page. That history is reconstructed from the MahaRERA filings of each past project — the registered completion date against the occupancy certificate date — and we do it as part of the free report on this project rather than repeating a claim.

We do not publish resident reviews for Namrata Group, and we would treat any we found with caution: review sections on property portals are routinely seeded by developers and by competitors, so a rating there is weak evidence either way. What is worth doing is talking to the society office or a few residents at a completed Namrata Group project — handover delays, water supply, seepage in the first monsoon and how maintenance was transitioned are all things people will tell you in person and will not write online. We arrange those conversations as part of an advisory engagement; ask us for the list.

We have not published a title opinion for Namrata 6 Boulevard on this page. The plot is recorded under Survey No. 41/4, 62/4/4 & 62/4/5. Zoning on record is R1 Residential. A clear title means the 30-year search shows an unbroken ownership chain, no subsisting mortgage beyond the disclosed construction finance, no injunction, and 7/12 or property-card entries that match the promoter named in the RERA filing. Ask for the title certificate and the search report — both are documents the developer already holds, and a reluctance to share them is itself an answer.

The documents we have sighted for Namrata 6 Boulevard are: Commencement Certificate, Legal Title Report, Sanctioned Layout Plan, RERA Approval Certificate. On the Development Plan, road reservations affecting the plot: Direct access onto the 100 FT Aundh-Ravet BRTS road with connecting 80 FT DP roads linking Tathawade, Wakad, and Hinjewadi.. The set to insist on is the commencement certificate, the sanctioned building plans and layout, the environmental clearance where the plot size requires one, the fire NOC, and — for a completed building — the occupancy certificate. Ask for the commencement certificate specifically: construction that has started without one is the single most common approval defect in Pune.

Construction on Namrata 6 Boulevard is recorded as Self Funded / Bank Approved Project. Funding matters more than turnover for a buyer: a self-funded project stops when sales stop, while a debt-funded one carries a lender with a charge over the land, and a stalled project with a mortgage on it is far harder to unwind. You can check this yourself — the charges registered against a developer are public on the MCA portal, and the RERA filing lists the project's own financing. Insolvency proceedings, if any, appear on the NCLT and IBBI sites. Check company filings on the MCA portal

We do not publish a MahaRERA complaint history for Namrata Group on this page, and you should not assume the absence of one here means there are none. Complaints are filed under Section 31 of the Real Estate (Regulation and Development) Act, 2016, and MahaRERA publishes both the complaint register and the orders passed. Search the developer's name and each of its project registration numbers — companies often build under a different registered entity per project, which is why searching only the brand name misses cases. The pattern matters more than the count: several orders on the same complaint type across different projects says more than one contested case. Search complaints and orders on MahaRERA

We have not published a defect history for Namrata Group's completed projects, and we will not infer one from a score. On Namrata 6 Boulevard the structure is recorded as Mivan Aluminium Formwork Shuttering, which tells you the method but not the workmanship. Under Section 14(3) of the RERA Act the promoter is liable for structural defects and defects in workmanship, quality or services for five years from handover, and must rectify them within 30 days of being told, at no cost to you. The practical test is a visit to a Namrata Group building two or three monsoons old: look at ceiling corners in the top-floor flats, the parking podium, and the external wall on the weather side.

Future Development Plan proposals recorded for this area: Positioned within West Pune's prime growth corridor adjacent to Hinjewadi IT Park and EON IT Park Tathawade Phase 2. The upcoming Pune Metro Line 3 extension and BRTS corridor expansion will significantly improve connectivity and property valuation.. Section 14 of the RERA Act binds the promoter to the sanctioned plans and specifications, and forbids alterations to the sanctioned plan of a building without the written consent of at least two-thirds of the allottees. To check Namrata 6 Boulevard yourself, compare the sanctioned layout attached to the MahaRERA filing against what is standing on site — floor count, tower positions, setbacks and the open space are the things that move. Unauthorised construction is not merely a paperwork problem: it can block the occupancy certificate for the whole building, including flats that were built exactly as approved.

Under Section 18 of the RERA Act, if the promoter fails to hand over by the date in your agreement you may either withdraw and claim a full refund with interest, or stay in the purchase and claim interest for every month of delay until you get possession. The remedy is yours to choose, not the developer's. The date that counts is the one in your agreement for sale, which is why the MahaRERA-committed date for Namrata 6 Boulevard — Dec 2030 — matters more than any date quoted verbally. Check what your draft agreement says about compensation before signing: developer-drafted clauses routinely offer a token per-square-foot amount far below the statutory interest, and a clause cannot take away a right the Act gives you.

We do not record industry-association membership for Namrata Group, because it is weak evidence. CREDAI and NAREDCO are voluntary trade bodies, not regulators: membership is not an approval, it is not a quality certification, and it cannot be relied on the way a RERA registration can. If it matters to you, both bodies publish member directories for their Pune chapters and you can check the name there in a minute. Weigh it well below the RERA filing, the title search and the delivery history.

Everything below is public and free. On the MCA portal, "View Company Master Data" gives you the registered entity behind Namrata Group, its incorporation date, paid-up capital and status; the signatory list gives you the directors, and each director's DIN shows every other company they run — which is how you find the sister companies a group builds through. Charges registered against the company show who has lent against what. On MahaRERA, searching the promoter name lists every project it has registered, with the committed and revised completion dates for each. The RERA filing for Namrata 6 Boulevard names the promoter entity; check that it is the same company whose track record you have been reading about, because the marketing brand and the registered promoter are frequently not the same. Look up the company on the MCA portal

Namrata 6 Boulevard is marketed with Swimming Pool, Aqua Gym, Hot Spring Jacuzzi, Club House, Pickleball Court and 10 more. What binds the developer is the amenity list in the agreement for sale and in the MahaRERA filing — not the brochure, not the render, and not the show flat. Section 11 of the RERA Act requires the promoter to deliver the amenities as declared to the authority, and the agreement is the document a court reads. Before signing, check each amenity you are paying for appears in the agreement's specification annexure with a delivery stage attached. Anything described as "proposed", "planned" or shown only in a render is not a commitment, and a clubhouse promised for "phase 2" of a multi-phase project may be years behind your handover.

Prices, possession & buying process

The practical detail on this project.

Namrata Group's target for Namrata 6 Boulevard is December 2029. The date committed in the MahaRERA filing is December 2030. Where the two differ, the RERA date is the one that carries legal weight and the one to plan your rent or loan around.

Namrata 6 Boulevard offers 2 BHK and 3 BHK and 4 BHK homes with carpet areas from 797 to 1538 sq ft. These are RERA carpet areas — the usable floor area inside your walls — not built-up or super built-up, which is what quoted rates on portals are usually based on. Compare projects on carpet area or the comparison is meaningless.

All-inclusive prices at Namrata 6 Boulevard run ₹95.00 Lacs – ₹1.94 Cr, depending on configuration and floor. Payments follow a CLP (Construction Linked Plan): Standard slab-wise payment schedule mapped to construction progress with bank home loan approvals up to 90%. Ask for the cost sheet in writing: stamp duty, registration, GST where applicable, floor-rise, parking and the maintenance deposit are frequently quoted separately from the headline price.

Home loans of up to 90 per cent are indicated under the developer's payment scheme for Namrata 6 Boulevard. Individual lender panels vary, and a project being "bank approved" in a brochure means one bank has done its own legal check — not that yours will. We confirm the current lender panel as part of our advisory work rather than repeating the developer's claim. A bank's own legal team declining a project is a signal worth knowing about.

Yes. NRIs and OCI cardholders may buy residential property in India under RBI rules, with payments routed through NRE or NRO accounts and no special permission needed for a residential purchase. We handle documentation, power of attorney and remote signing for buyers of Namrata 6 Boulevard from outside India as part of an advisory engagement. Call +91 93738 11941 or write to hello@propertyengineer.in.