Godrej Elanor (Godrej Mahalunge) — Verified Buyer Due-Diligence Report

by Godrej Properties Ltd. · Mahalunge, Pune

₹1.9 Cr – ₹2.09 Cr

EMI from ₹1.3 L/mo · estimate

Book a site visit

No litigation on record

Checked against court records at the time of our review. Records change, so confirm before you pay.

Possession: two different dates

Builder’s target
December 2030
MahaRERA committed date
December 2030 (reported as 1 December 2030 on one RERA-sourced third-party page) — this is the one date on which every source checked agrees, even amid the registration-number uncertainty above.

RERA PR1260002602617Verify on MahaRERA

About this project

About Godrej Elanor

Godrej Elanor — indexed on third-party portals only under the generic placeholder name "Godrej Mahalunge," with its own uploaded legal documents independently confirmed to carry the "Elanor" name — is an 8.5-acre, 5-tower residential development by Godrej Properties Ltd. on Nande-Balewadi Road in Mahalunge, Pune, adjacent to the Mula River. The current launch covers 3 BHK homes of 1,270 to 1,320 sq ft carpet across B+G+3P+35-floor towers, priced from roughly ₹1.80 Cr, with a 4 BHK duplex configuration referenced but not yet specified anywhere found. Godrej Properties is an NSE- and BSE-listed, national top-tier developer with a 36-year operating history (and a 125-plus-year parent Godrej Group lineage), which is the strongest single reason to look here. The reasons to look carefully: the project's MahaRERA registration status is itself unsettled across sources as of this report — one detailed listing names a specific, recently-registered number while the client's own brief and another listing describe registration as still pending; the developer's own aggregated price sheet shows only 1 covered parking space per 3 BHK unit against the 2 spaces described in the client's brief; lift counts are reported two very different ways (7 versus 3 per tower); and the project carries a meaningful premium — roughly ₹14,800 to ₹15,800 per sq ft — over Mahalunge's general locality average of roughly ₹9,000 to ₹11,700 per sq ft reported across independent sources. None of this is disqualifying for a developer of this scale, but all of it is worth resolving in writing before booking.

Property Engineer Verdict

Our score for Godrej Elanor across legal standing, builder record, livability, connectivity and value, with the buy, wait or walk-away call.

Free. One call from an advisor, never sold on.

Key facts

The facts that decide daily life

Land parcel
8.5 acres, consistently corroborated across the client's brief, an independent third-party listing and the aggregator screenshots supplied.
Towers
5
Floors
Basement + Ground + 3 Podium levels + 35 residential floors (B+G+3P+35), consistently corroborated across every source checked. The current launch is reported to cover Towers 4 and 5 of the 5-tower master plan, per the client's brief; this specific detail was not independently cross-checked.
Flats per floor
4
Lifts per tower
The client's brief states 7 high-speed elevators per tower (passenger plus service/stretcher lifts). An independent fetch of a third-party listing instead gives 3 lifts per tower. A gap this large on a 38-storey building is material — confirm the actual count for your specific tower before relying on either figure.
Ceiling height
10 ft 6 in clear floor-to-slab height, per the client's brief; not independently corroborated.
Construction
Mivan / aluminium-formwork monolithic RCC shear-wall structure, per the client's brief; an independent source corroborates only a generic 'earthquake-resistant framed structure' claim, without naming Mivan specifically.
Balconies
2 large terrace decks — a living-room deck and a primary-bedroom balcony — per the client's brief; not independently corroborated.
Dry balcony
1 dedicated utility/dry balcony adjoining the kitchen, per the client's brief; not independently corroborated.
Parking per flat
The client's brief states 2 covered car parks for 3 BHK and 4 BHK duplex units. An independently fetched copy of the developer's own aggregated price sheet instead shows exactly 1 parking space against every one of the four 3 BHK unit rows actually quoted. Confirm in writing which allocation applies to your specific unit before booking.
Parking levels
The client's brief describes 3 multi-level podium levels plus basement parking. An independently fetched third-party listing instead describes podium parking only, with no basement level mentioned. Not reconciled here.
Approach road
24 m wide connecting DP road, per the client's brief.
Builder grade
A Cat
Construction funding
Not detailed in the available material. Godrej Properties Ltd. is itself NSE- and BSE-listed, with audited consolidated financials at the parent level — see builderBackgroundNotes.
Construction progress
Not published in any source found — consistent with the project's unsettled RERA-registration status and New Launch positioning.

Unit plans and prices

Pick a layout, see what it costs

1270 sq ft carpet

Quoted price
Ask us
All-inclusive
₹1.9 Cr
Minimum down payment
₹29 L

1280 sq ft carpet

Quoted price
Ask us
All-inclusive
₹2.03 Cr
Minimum down payment
₹30 L

1310 sq ft carpet

Quoted price
Ask us
All-inclusive
₹1.96 Cr
Minimum down payment
₹30 L

1320 sq ft carpet

Quoted price
Ask us
All-inclusive
₹2.09 Cr
Minimum down payment
₹31 L

Site visit

Pick a day to walk through

See Godrej Elanor with an advisor who has already read the legal file.

  • An advisor calls to confirm the day and time
  • No cost, and no obligation to book
  • Your number goes to the builder only if you ask us to introduce you
or call +91 93738 11941

Choose a day to continue.

Our read

What works, and what to weigh

Pros & cons

The strengths and the drawbacks we found, written as plainly as each other.

Free. One call from an advisor, never sold on.

Amenities

What comes with the address

  • Grand Triple-Height Air-Conditioned Entrance Lobby with Marble Cladding
  • 35,000 sq ft French & Spanish-Themed Grand Clubhouse
  • Multi-Temperature Outdoor Swimming Pool and Kids' Splash Pool
  • Rooftop Sky Lounge, Stargazing Terrace Deck and Yoga Gazebo
  • Panoramic River-View Walking Decks
  • Badminton, Tennis, Squash and Basketball Courts
  • Fully Equipped Fitness Gymnasium, Spa and Steam Rooms
  • 1-Lakh sq ft Dedicated Riverfront Promenade and Jogging Track
  • 3-Tier Security with 24x7 CCTV Coverage and RFID Vehicle Tags
  • EV Charging Infrastructure at Parking Levels
  • Organic Waste Converter (OWC) and Rainwater Harvesting Systems
  • Co-Working Spaces, Multipurpose Lawn and Amphitheatre

Location

Where Godrej Elanor stands

Approach road: 24 m wide connecting DP road, per the client's brief.. The wider the road to the society, the easier access stays as the area builds out.

Map showing the location of Godrej Elanor, Mahalunge, Pune, Maharashtra 411045, India
Mahalunge, Pune, Maharashtra 411045, IndiaOpen in Google Maps
  • Rajiv Gandhi Infotech Park, Hinjawadi Phase 1Not independently measured for this specific site

Area growth

What is being built around it

Items marked Planned or In progress have not been delivered. Dates are the authority's or developer's, not ours.

  1. PlannedOngoing as of our most recent check

    The Mahalunge-Maan Town Planning Scheme (PMRDA TPS-1) covering this corridor was, as of our most recent check on a different project in this same stretch, still being varied by an arbitrator

    PMRDA's own published scheme pages have shown a preliminary scheme sanctioned in December 2019 and a final scheme drawn up by an arbitrator in February 2020, with a further variation in progress because of a Blue/Red flood-line change and an open question over whether PMRDA or PMC will ultimately execute it. This is general area background carried over from our own recent research on a different project on the same Nande-Balewadi Road corridor, not independently re-verified today against this specific plot — confirm current status and whether it affects this project's own sanctioned roads or FSI before relying on it.

    Source: PMRDA official project pages (pmrda.gov.in), carried over from recent research on a different Mahalunge project

  2. PlannedCurrent, 2026

    This project sits meaningfully above Mahalunge's own general price average

    Independent sources place Mahalunge's general average around ₹9,000–11,700 per sq ft in 2026. This project's own closable rate of roughly ₹14,800–15,800 per sq ft is 30–60% above that range — a real brand and amenity premium that buyers should weigh deliberately rather than benchmark against the area's headline average.

    Source: Housing.com, PropertyPistol, Square Yards Mahalunge rate pages — cross-referenced against the client's own brief

Development plan and survey

Zoning
PMRDA-administered Mahalunge-Maan Hi-Tech City Town Planning Scheme (TPS-1) area, per the general area context carried over from recent research on a different project in this same corridor — not independently re-verified against this specific plot today.
Road reservations
24 m connecting DP road, per the client's brief; not independently re-verified against a sanctioned road-widening line.
Future DP proposals
The Mahalunge-Maan TPS-1 final scheme has, per our most recent check on a nearby project, been reported under ongoing variation by an appointed arbitrator because of a Blue/Red flood-line change, with no published completion date — re-confirm current status before relying on it for this specific plot.
Survey numbers
Not published in any source found.
DP remarks
No survey number or 7/12 extract was found for this project in any source checked. Obtain both directly from the developer, and confirm whether the TPS-1 variation affects this parcel's sanctioned FSI, road widths or any reservation.

Before you book

Six things people ask us next

  • Maintenance

    3 BHK: ₹6,500 – ₹7,000/month (reported inconsistently on the same independent source as a flat ₹6,500 elsewhere on its own page) · 4 BHK Duplex: Not published in any source found

  • Payment plan

    Construction-Linked Payment Plan (CLP) / Milestone Payment Structure

  • Minimum down payment

    From ₹29.00 Lacs, depending on the unit.

  • Documents

    5 documents held on this project, shared with your free report.

  • Construction progress

    Not published in any source found — consistent with the project's unsettled RERA-registration status and New Launch positioning. at our last check.

  • Rental income

    3 BHK rents for about Not independently corroborated a month semi-furnished.

What it costs to own

Your monthly cost, before you commit

Every figure here is an estimate from the assumptions you can see and change.

Unit

Loan tenure

Down payment20% · ₹38 L
Interest rate (assumption)8.75%

Monthly EMI, estimated

₹1.3 L

EMI
₹1.3 L
Maintenance (mid-point)
₹6,750
Together, per month
₹1.4 L

Estimated upfront

₹51.3 L

Down payment plus stamp duty and registration at an assumed 7% of price. The real figure varies by buyer.

An estimate, not a loan offer.

Free download

Godrej Elanor buyer summary report

A short PDF with key facts, MahaRERA and possession checks, litigation on record, strengths and watch-outs. An advisor calls within 24 hours to take you through the full verdict — no obligation.

We collect your name, mobile number and optional email to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Pricing intelligence

The quoted price is where the conversation starts.

Godrej Elanor is quoted at ₹1.80 Cr – ₹2.10 Cr. Tell us where to reach you and we will send the closable price — plus how it stacks up against the projects around it.

  • Comparative pricing against nearby projects, per square foot
  • The price this project actually closes at, not the quoted one
  • Backed by registered sale agreements from the last six months

Get the closable price

Free, and no obligation to buy through us.

+91

One call from an advisor. Your number is never sold on.

Investment outlook

Appreciation & rental income

Appreciation & rental income

What this micro-market has appreciated at, and the rent a 2 or 3 BHK here actually commands.

Free. One call from an advisor, never sold on.

Handover

Possession & delivery

Build stage

New Launch — RERA registration status unsettled, see reraNumber

Builder's target

December 2030

RERA committed date

December 2030 (reported as 1 December 2030 on one RERA-sourced third-party page) — this is the one date on which every source checked agrees, even amid the registration-number uncertainty above.

Construction complete

Not published in any source found — consistent with the project's unsettled RERA-registration status and New Launch positioning.

Construction funding

Not detailed in the available material. Godrej Properties Ltd. is itself NSE- and BSE-listed, with audited consolidated financials at the parent level — see builderBackgroundNotes.

Paperwork

Documents

Paperwork & documents

The title, approval and layout documents we hold on this project, and how to request copies.

Free. One call from an advisor, never sold on.

Developer

Builder profile

Godrej Properties Ltd.

Building since

1990, independently confirmed (originally incorporated 8 February 1985 as Sea Breeze Constructions and Investments Pvt. Ltd., renamed Godrej Properties Limited in 1990). The parent Godrej Group's 1897 founding is also independently confirmed.

Years of experience

36

Total projects

100

Cities of operation

Pune, Mumbai, Mumbai Suburban, Bangalore Urban, Bangalore Rural, Hyderabad, Ahmedabad, Gurugram

Our builder grade

A Cat

Godrej Properties Ltd. is the NSE- and BSE-listed real estate arm of the Godrej Group, operating under its present name since 1990 (originally incorporated 1985) and tracing its parent conglomerate to 1897. `totalProjects` here reflects the client brief's own "100+" framing; independently found counts range from 19 completed residential projects (the company's own investor FAQ) to 92 active-and-upcoming and 286 total projects on various aggregator pages, so no single figure should be treated as precise. In Mahalunge specifically the company already runs an established cluster of projects — Green Cove, Green Vistas, Meadows, Hill Retreat and River Royale — ahead of this launch. The company's national scale brings a correspondingly larger litigation and regulatory-order footprint than any other builder in our current coverage, detailed in full, and none of it concerning this project, in builderLitigationSummary.

Background

Godrej Properties Ltd. is the NSE- and BSE-listed real estate arm of the 125-plus-year-old Godrej Group, operating under its own name since 1990. Total completed-project counts vary sharply by source — the company's own investor-facing FAQ cites 19 completed residential and 8 completed commercial projects, while aggregator pages variously cite 84, 92 or 286 total projects depending on whether active, upcoming or historical developments are counted — so any single headline number should be treated as approximate; the client brief's own "100+ completed and ongoing" framing sits within this range. In Mahalunge specifically, Godrej already has an established cluster of projects (Green Cove, Green Vistas, Meadows and its Phase 2, Hill Retreat and its Phase 2, River Royale), giving this listing unusually good nearby comparables for build-quality inspection. At the group level, Godrej Properties carries a larger litigation and regulatory-order footprint than any other builder in our current coverage, which is substantially a function of its scale (dozens of live projects nationally) rather than a project-specific finding — none of it concerns Mahalunge or this project. The single largest recent item is a reported ~₹70 Cr one-time financial impact from an August–September 2026 settlement of a Gurugram joint-development dispute (Godrej Air, with Orris Infrastructure), following which the Bombay High Court quashed an FIR against Orris' managing director and enabled the project to resume. Multiple 2026 state-RERA orders against other Godrej projects are on record (detailed in builderLitigationSummary), alongside an NCDRC order directing a related entity, Godrej Projects Development Limited, to refund homebuyers across five separate cases. None of these matters names Godrej Elanor / Godrej Mahalunge.

15-year litigation search on the developer

No litigation is disclosed against Godrej Elanor / Godrej Mahalunge itself, and `litigation` is set false accordingly, per both the client's brief and an independently fetched third-party listing. The wider Godrej Properties / Godrej Group litigation and regulatory record is larger than any other builder in our coverage, reflecting its national scale; nothing found concerns Mahalunge or this project. Recorded here in full: (1) the NCDRC has ordered a related entity, Godrej Projects Development Limited, to refund more than ₹4 Cr to homebuyers across five separate cases over unmet commitments, per an order reported around October 2024; a separate, earlier case ordered a ₹1.07 Cr refund for delayed possession. (2) In 2026, MahaRERA issued a final order (18 May 2026) on a Godrej City, Panvel project allowing a partial refund in one case, and a further order (2 June 2026) directed the promoter of Godrej Avenue Eleven to execute pending sale agreements and pay delay interest. (3) A DIFFERENT Pune project, "Godrej 24," was ordered by MahaRERA to fix seepage defects within 30 days or face a penalty — a construction-quality finding, not a title dispute, and unrelated to Mahalunge. (4) Chhattisgarh RERA issued a ₹10 lakh penalty against Godrej Properties over advertisements the company states were not issued or authorised by it, and which it is evaluating legal remedies against. (5) In Haryana, several pending Section 18 (delay-compensation) complaints against Godrej Properties were listed with hearings around May 2026, filed by Gurugram homebuyers in 2025. (6) The largest item by value: an August 2026 settlement agreement with Orris Infrastructure over the Godrej Air project in Gurugram, following which the Bombay High Court (3 Sept 2026) quashed an FIR against Orris' managing director to allow project resumption; Godrej Properties has estimated a one-time financial impact of approximately ₹70 Cr from this settlement. Our own 15-year civil and criminal search on Godrej Properties Ltd. has NOT been run.

Other projects

Godrej River Royale, Mahalunge, PuneGodrej Hill Retreat, Mahalunge, PuneGodrej Green Cove, Mahalunge, PuneGodrej Meadows, Mahalunge, PuneGodrej Avenue ElevenGodrej City, Panvel

Get the free Property Engineer report on Godrej Elanor

Title and approvals, DP and survey verification, a 15-year builder search, registered sale agreements from the last six months, and area growth analysis — written for you, not for the developer. No cost, no obligation.

Ask about this project

We collect your name, phone number and the requirements you describe to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Questions

Godrej Elanor — buyer questions answered

The questions buyers actually ask about Godrej Properties Ltd. before paying a booking amount, answered from what we have checked on Godrej Elanor in Mahalunge. Where we have not verified something, the answer says so rather than guessing.

Builder credibility, legal standing & approvals

The questions buyers ask before trusting a developer with a booking amount. Answered from what we have verified — and where we have not verified something, it says so.

Godrej Elanor in Mahalunge, Pune is registered with MahaRERA under number PR1260002602617. A registration number on its own is not proof that the registration is still live: the MahaRERA portal shows the registered completion date, the current status and any extensions applied for, and that is what to check. The date filed with MahaRERA for this project is Dec 2030. Confirm the number against the portal before you pay anything, including a booking amount. Verify on the MahaRERA portal

Godrej Properties Ltd. reports 36 years in the business, 100 projects, building since 1990, independently confirmed (originally incorporated 8 February 1985 as Sea Breeze Constructions and Investments Pvt. Ltd., renamed Godrej Properties Limited in 1990). The parent Godrej Group's 1897 founding is also independently confirmed.. Named earlier work includes Godrej River Royale, Mahalunge, Pune, Godrej Hill Retreat, Mahalunge, Pune, Godrej Green Cove, Mahalunge, Pune, Godrej Meadows, Mahalunge, Pune and 2 more. Godrej Properties Ltd. is the NSE- and BSE-listed real estate arm of the 125-plus-year-old Godrej Group, operating under its own name since 1990. Total completed-project counts vary sharply by source — the company's own investor-facing FAQ cites 19 completed residential and 8 completed commercial projects, while aggregator pages variously cite 84, 92 or 286 total projects depending on whether active, upcoming or historical developments are counted — so any single headline number should be treated as approximate; the client brief's own "100+ completed and ongoing" framing sits within this range. In Mahalunge specifically, Godrej already has an established cluster of projects (Green Cove, Green Vistas, Meadows and its Phase 2, Hill Retreat and its Phase 2, River Royale), giving this listing unusually good nearby comparables for build-quality inspection. At the group level, Godrej Properties carries a larger litigation and regulatory-order footprint than any other builder in our current coverage, which is substantially a function of its scale (dozens of live projects nationally) rather than a project-specific finding — none of it concerns Mahalunge or this project. The single largest recent item is a reported ~₹70 Cr one-time financial impact from an August–September 2026 settlement of a Gurugram joint-development dispute (Godrej Air, with Orris Infrastructure), following which the Bombay High Court quashed an FIR against Orris' managing director and enabled the project to resume. Multiple 2026 state-RERA orders against other Godrej projects are on record (detailed in builderLitigationSummary), alongside an NCDRC order directing a related entity, Godrej Projects Development Limited, to refund homebuyers across five separate cases. None of these matters names Godrej Elanor / Godrej Mahalunge. We score Godrej Properties Ltd. 78 out of 100 on track record, assessed from public records rather than from the developer's own material. Figures a developer publishes about itself are claims until checked, and where two sources disagree we score the more conservative one.

No litigation is disclosed against Godrej Elanor in the records we have checked. No litigation is disclosed against Godrej Elanor / Godrej Mahalunge itself, and `litigation` is set false accordingly, per both the client's brief and an independently fetched third-party listing. The wider Godrej Properties / Godrej Group litigation and regulatory record is larger than any other builder in our coverage, reflecting its national scale; nothing found concerns Mahalunge or this project. Recorded here in full: (1) the NCDRC has ordered a related entity, Godrej Projects Development Limited, to refund more than ₹4 Cr to homebuyers across five separate cases over unmet commitments, per an order reported around October 2024; a separate, earlier case ordered a ₹1.07 Cr refund for delayed possession. (2) In 2026, MahaRERA issued a final order (18 May 2026) on a Godrej City, Panvel project allowing a partial refund in one case, and a further order (2 June 2026) directed the promoter of Godrej Avenue Eleven to execute pending sale agreements and pay delay interest. (3) A DIFFERENT Pune project, "Godrej 24," was ordered by MahaRERA to fix seepage defects within 30 days or face a penalty — a construction-quality finding, not a title dispute, and unrelated to Mahalunge. (4) Chhattisgarh RERA issued a ₹10 lakh penalty against Godrej Properties over advertisements the company states were not issued or authorised by it, and which it is evaluating legal remedies against. (5) In Haryana, several pending Section 18 (delay-compensation) complaints against Godrej Properties were listed with hearings around May 2026, filed by Gurugram homebuyers in 2025. (6) The largest item by value: an August 2026 settlement agreement with Orris Infrastructure over the Godrej Air project in Gurugram, following which the Bombay High Court (3 Sept 2026) quashed an FIR against Orris' managing director to allow project resumption; Godrej Properties has estimated a one-time financial impact of approximately ₹70 Cr from this settlement. Our own 15-year civil and criminal search on Godrej Properties Ltd. has NOT been run. "None on record" means none found in what we searched — it is not a guarantee that none exists. Civil, consumer, RERA and NCLT matters sit in different registries, and a fresh search before you pay is worth the hour it takes.

On Godrej Elanor, the date Godrej Properties Ltd. quotes and the date filed with MahaRERA agree (December 2030 (reported as 1 December 2030 on one RERA-sourced third-party page) — this is the one date on which every source checked agrees, even amid the registration-number uncertainty above.), which is a better sign than it sounds — the two often differ by a year or more. We do not publish a completed-versus-promised delivery history for Godrej Properties Ltd.'s earlier projects on this page. That history is reconstructed from the MahaRERA filings of each past project — the registered completion date against the occupancy certificate date — and we do it as part of the free report on this project rather than repeating a claim.

We do not publish resident reviews for Godrej Properties Ltd., and we would treat any we found with caution: review sections on property portals are routinely seeded by developers and by competitors, so a rating there is weak evidence either way. What is worth doing is talking to the society office or a few residents at a completed Godrej Properties Ltd. project — handover delays, water supply, seepage in the first monsoon and how maintenance was transitioned are all things people will tell you in person and will not write online. We arrange those conversations as part of an advisory engagement; ask us for the list.

PR1260002602617, as already listed on the MahaRERA portal; and a separate search result for the same project shows the RERA field as "NA." Read PR1260002602617 directly off the MahaRERA portal before this listing is published as representing an Active, registered project — if it does not resolve, this project should be marked pre-RERA / registration-pending rather than New Launch with an Active registration. SEPARATELY: (a) the lift-count conflict (7 per tower per the client brief vs 3 per tower per an independent listing) and the parking-allocation conflict (2 spaces per the client brief vs 1 space shown on the developer's own aggregated price sheet) should both be confirmed in writing, specific to the unit being sold, before booking; (b) obtain the survey number and 7/12 extract, neither of which were found anywhere in this pass, and confirm the TPS-1 variation's current status and effect on this specific plot; (c) confirm whether a genuine 4 BHK duplex configuration is on sale today, since no carpet area or price was found for it anywhere; (d) run our own 15-year civil and criminal search on Godrej Properties Ltd., separate from the litigation items already detailed in builderLitigationSummary, none of which concerns this project. ALSO OUTSTANDING: room-by-room dimensions, a per-tower structural breakdown, project photography, an official walkthrough video and a pinned map location. NAMING: this project is independently confirmed to appear on every third-party portal checked only as "Godrej Mahalunge," while its own uploaded legal documents are reported to carry the "Elanor" label — both names are used in SEO fields here so the page can be found under either. PRICING PROVENANCE: unitPlans.allInclusivePrice carries the independently fetched per-unit price sheet; unitPlans.quotedPrice records the client brief's own stated price band and flags where the two do not align, including a price inversion between the 1,280 and 1,310 sq ft units on the price sheet itself (the smaller unit is priced higher), which was not explained by any source and should be confirmed directly rather than assumed to be an error in one direction. MICRO-MARKET: appreciationRate and rentalComparables are only partly populated, reflecting how inconsistently Mahalunge pricing is reported across sources (roughly ₹9,000–11,700 per sq ft depending on the page) — a broker check is needed before publication. The plot is recorded under Not published in any source found.. Zoning on record is PMRDA-administered Mahalunge-Maan Hi-Tech City Town Planning Scheme (TPS-1) area, per the general area context carried over from recent research on a different project in this same corridor — not independently re-verified against this specific plot today.. A clear title means the 30-year search shows an unbroken ownership chain, no subsisting mortgage beyond the disclosed construction finance, no injunction, and 7/12 or property-card entries that match the promoter named in the RERA filing. Ask for the title certificate and the search report — both are documents the developer already holds, and a reluctance to share them is itself an answer.

The documents we have sighted for Godrej Elanor are: Commencement Certificate, Legal Title Report, Layout Plan, Proforma Allotment Letter, Proforma Sale Agreement. On the Development Plan, road reservations affecting the plot: 24 m connecting DP road, per the client's brief; not independently re-verified against a sanctioned road-widening line.. The set to insist on is the commencement certificate, the sanctioned building plans and layout, the environmental clearance where the plot size requires one, the fire NOC, and — for a completed building — the occupancy certificate. Ask for the commencement certificate specifically: construction that has started without one is the single most common approval defect in Pune.

Construction on Godrej Elanor is recorded as Not detailed in the available material. Godrej Properties Ltd. is itself NSE- and BSE-listed, with audited consolidated financials at the parent level — see builderBackgroundNotes.. Funding matters more than turnover for a buyer: a self-funded project stops when sales stop, while a debt-funded one carries a lender with a charge over the land, and a stalled project with a mortgage on it is far harder to unwind. You can check this yourself — the charges registered against a developer are public on the MCA portal, and the RERA filing lists the project's own financing. Insolvency proceedings, if any, appear on the NCLT and IBBI sites. Check company filings on the MCA portal

We do not publish a MahaRERA complaint history for Godrej Properties Ltd. on this page, and you should not assume the absence of one here means there are none. Complaints are filed under Section 31 of the Real Estate (Regulation and Development) Act, 2016, and MahaRERA publishes both the complaint register and the orders passed. Search the developer's name and each of its project registration numbers — companies often build under a different registered entity per project, which is why searching only the brand name misses cases. The pattern matters more than the count: several orders on the same complaint type across different projects says more than one contested case. Search complaints and orders on MahaRERA

We have not published a defect history for Godrej Properties Ltd.'s completed projects, and we will not infer one from a score. On Godrej Elanor the structure is recorded as Mivan / aluminium-formwork monolithic RCC shear-wall structure, per the client's brief; an independent source corroborates only a generic 'earthquake-resistant framed structure' claim, without naming Mivan specifically., which tells you the method but not the workmanship. Under Section 14(3) of the RERA Act the promoter is liable for structural defects and defects in workmanship, quality or services for five years from handover, and must rectify them within 30 days of being told, at no cost to you. The practical test is a visit to a Godrej Properties Ltd. building two or three monsoons old: look at ceiling corners in the top-floor flats, the parking podium, and the external wall on the weather side.

No survey number or 7/12 extract was found for this project in any source checked. Obtain both directly from the developer, and confirm whether the TPS-1 variation affects this parcel's sanctioned FSI, road widths or any reservation. Future Development Plan proposals recorded for this area: The Mahalunge-Maan TPS-1 final scheme has, per our most recent check on a nearby project, been reported under ongoing variation by an appointed arbitrator because of a Blue/Red flood-line change, with no published completion date — re-confirm current status before relying on it for this specific plot.. Section 14 of the RERA Act binds the promoter to the sanctioned plans and specifications, and forbids alterations to the sanctioned plan of a building without the written consent of at least two-thirds of the allottees. To check Godrej Elanor yourself, compare the sanctioned layout attached to the MahaRERA filing against what is standing on site — floor count, tower positions, setbacks and the open space are the things that move. Unauthorised construction is not merely a paperwork problem: it can block the occupancy certificate for the whole building, including flats that were built exactly as approved.

Under Section 18 of the RERA Act, if the promoter fails to hand over by the date in your agreement you may either withdraw and claim a full refund with interest, or stay in the purchase and claim interest for every month of delay until you get possession. The remedy is yours to choose, not the developer's. The date that counts is the one in your agreement for sale, which is why the MahaRERA-committed date for Godrej Elanor — Dec 2030 — matters more than any date quoted verbally. Check what your draft agreement says about compensation before signing: developer-drafted clauses routinely offer a token per-square-foot amount far below the statutory interest, and a clause cannot take away a right the Act gives you.

We do not record industry-association membership for Godrej Properties Ltd., because it is weak evidence. CREDAI and NAREDCO are voluntary trade bodies, not regulators: membership is not an approval, it is not a quality certification, and it cannot be relied on the way a RERA registration can. If it matters to you, both bodies publish member directories for their Pune chapters and you can check the name there in a minute. Weigh it well below the RERA filing, the title search and the delivery history.

Everything below is public and free. On the MCA portal, "View Company Master Data" gives you the registered entity behind Godrej Properties Ltd., its incorporation date, paid-up capital and status; the signatory list gives you the directors, and each director's DIN shows every other company they run — which is how you find the sister companies a group builds through. Charges registered against the company show who has lent against what. On MahaRERA, searching the promoter name lists every project it has registered, with the committed and revised completion dates for each. The RERA filing for Godrej Elanor names the promoter entity; check that it is the same company whose track record you have been reading about, because the marketing brand and the registered promoter are frequently not the same. Look up the company on the MCA portal

Godrej Elanor is marketed with Grand Triple-Height Air-Conditioned Entrance Lobby with Marble Cladding, 35,000 sq ft French & Spanish-Themed Grand Clubhouse, Multi-Temperature Outdoor Swimming Pool and Kids' Splash Pool, Rooftop Sky Lounge, Stargazing Terrace Deck and Yoga Gazebo, Panoramic River-View Walking Decks and 8 more. What binds the developer is the amenity list in the agreement for sale and in the MahaRERA filing — not the brochure, not the render, and not the show flat. Section 11 of the RERA Act requires the promoter to deliver the amenities as declared to the authority, and the agreement is the document a court reads. Before signing, check each amenity you are paying for appears in the agreement's specification annexure with a delivery stage attached. Anything described as "proposed", "planned" or shown only in a render is not a commitment, and a clubhouse promised for "phase 2" of a multi-phase project may be years behind your handover.

Prices, possession & buying process

The practical detail on this project.

Godrej Properties Ltd.'s target for Godrej Elanor is December 2030. The date committed in the MahaRERA filing is December 2030 (reported as 1 December 2030 on one RERA-sourced third-party page) — this is the one date on which every source checked agrees, even amid the registration-number uncertainty above.. Where the two differ, the RERA date is the one that carries legal weight and the one to plan your rent or loan around.

Godrej Elanor offers 3 BHK and 4 BHK Duplex homes with carpet areas from 1270 to 1320 sq ft. These are RERA carpet areas — the usable floor area inside your walls — not built-up or super built-up, which is what quoted rates on portals are usually based on. Compare projects on carpet area or the comparison is meaningless.

All-inclusive prices at Godrej Elanor run ₹1.80 Cr – ₹2.10 Cr, depending on configuration and floor. Payments follow a Construction-Linked Payment Plan (CLP) / Milestone Payment Structure: Per the client's brief: 10% booking fee / EOI, 10% on agreement execution, slab-wise progress payments across the 35 storeys, and a final 5% on possession handover. An independently fetched listing corroborates a standard Construction Linked Plan with up to 90% loan eligibility and lists an approved bank panel of Central Bank of India, Union Bank of India, Bank of India, Bank of Baroda, Citibank, Kotak Mahindra Bank, Axis Bank, State Bank of India, ICICI Bank and HDFC Bank. Ask for the cost sheet in writing: stamp duty, registration, GST where applicable, floor-rise, parking and the maintenance deposit are frequently quoted separately from the headline price.

Home loans of up to 90 per cent are indicated under the developer's payment scheme for Godrej Elanor. Individual lender panels vary, and a project being "bank approved" in a brochure means one bank has done its own legal check — not that yours will. We confirm the current lender panel as part of our advisory work rather than repeating the developer's claim. A bank's own legal team declining a project is a signal worth knowing about.

Yes. NRIs and OCI cardholders may buy residential property in India under RBI rules, with payments routed through NRE or NRO accounts and no special permission needed for a residential purchase. We handle documentation, power of attorney and remote signing for buyers of Godrej Elanor from outside India as part of an advisory engagement. Call +91 93738 11941 or write to hello@propertyengineer.in.

More projects

Similar projects to compare

  • Kohinoor Avantara

    Wakad · by Kohinoor Group

    New Launch (3+ yrs)Partner Project

    2 BHK · 3 BHK · 704–1087 sqft carpet

    ₹89 L – ₹1.38 Cr

    EMI from ₹62,920/mo · estimate, 20% down

  • Namrata 6 Boulevard

    Tathawade · by Namrata Group

    Under Construction (3+ yrs)

    2 BHK · 3 BHK · 4 BHK · 797–1538 sqft carpet

    ₹95 L – ₹1.88 Cr

    EMI from ₹67,162/mo · estimate, 20% down

  • Vardhaman Skysymphony

    Wakad · by Vardhaman Spaces

    Under Construction (4+ yrs)

    2 BHK · 3 BHK · 740–1189 sqft carpet

    ₹1.02 Cr – ₹1.64 Cr

    EMI from ₹72,111/mo · estimate, 20% down