← All properties
Mid Stage (1-2 yrs)No litigation on record

AR Mirador

by AR Realty · Wakad, Pune

₹95.38 Lacs – ₹1.50 Cr

AR Mirador photograph 1
AR Mirador photograph 2
AR Mirador photograph 3
Photo 1 of 3

Land parcel

2.25 acres

Towers / Floors

3 towers · B+G+14

Configurations

2 BHK · 3 BHK

Carpet area

7311124 sqft

RERA number

P52100079071

Possession status

Mid Stage (1-2 yrs)

Target possession

March 2028

Litigation

None on record

Property Engineer Verdict

Our composite score for AR Mirador across legal standing, builder record, livability, connectivity and value — plus the buy, wait or walk-away call.

Free. One call from an advisor, never sold on.

Overview

About the project

AR Mirador is built on a 2.25-acre parcel in Wakad with 5 flats per floor, offering 2 and 3 BHK homes. Construction is conventional brick-and-block rather than Mivan shuttering, and is self-funded by the developer. Located near Bhumkar Das Gugre Road, Bhagwan Nagar, Wakad.

Near Bhumkar Das Gugre Road, Bhagwan Nagar, Wakad, Pune

Nearby landmarks

  • EON IT Park300 m
  • Mumbai-Bengaluru Highway1.7 km
  • Phoenix Mall of the Millennium1.8 km
  • Hinjewadi IT Park Phase 12.7 km
  • Balewadi High Street6.5 km

The neighbourhood

What is around the project

  • EON IT Park300 m
  • Hinjewadi IT Park Phase 12.7 km
  • Hinjewadi IT Park Phase 25.8 km
  • Hinjewadi IT Park Phase 39 km
  • Balewadi High Street6.5 km

  • Indira International SchoolNearby
  • Akshara International SchoolNearby
  • Vidya Valley SchoolNearby
  • Euro SchoolNearby
  • Indus International SchoolNearby
  • Podar International SchoolNearby

  • Indira College of Management1.5 km
  • Indira School of Communication2 km
  • Balaji University2.5 km
  • JSPM3.5 km

  • Sukhwani SkylineNearby
  • iTrend LifeNearby
  • Golecho EthosNearby
  • Kohinoor SapphireNearby
  • Kiran SufalNearby
  • Wisteria FortuneNearby

Our read

Pros & cons

Pros & cons

The strengths and the drawbacks we found, written as plainly as each other.

Free. One call from an advisor, never sold on.

Specification

Amenities

Internal

Vitrified TilesGranite Kitchen PlatformStainless Steel SinkSolar Water HeaterGas PipelineBiometric LocksEarthquake Resistant Structure

External

Swimming PoolGymnasiumKids Play AreaMulti-Purpose CourtYoga and Meditation SpaceJogging TrackGardenCricket PitchSkating RinkSenior Citizen AreaTemple Complex

Costs

Pricing & unit plans

ConfigurationCarpet areaAll-inclusive priceMin. down paymentFloor plan
2 BHK731 sqft₹95.38 Lacs₹15.00 Lacs
2 BHK830 sqft₹1.10 Cr₹17.00 Lacs
3 BHK1124 sqft₹1.50 Cr-

Maintenance charges

  • 2 BHK₹2,900 – ₹3,300/month
  • 3 BHK₹4,000 – ₹4,500/month

Payment scheme

CLP (Construction Linked Plan)

Standard slab-wise payment against construction progress. Home loans of up to 90% are indicated.

Pricing intelligence

The quoted price is where the conversation starts.

AR Mirador is quoted at ₹95.38 Lacs – ₹1.50 Cr. Tell us where to reach you and we will send the closable price — plus how it stacks up against the projects around it.

  • Comparative pricing against nearby projects, per square foot
  • The price this project actually closes at, not the quoted one
  • Backed by registered sale agreements from the last six months

Get the closable price

Free, and no obligation to buy through us.

+91

One call from an advisor. Your number is never sold on.

Investment outlook

Appreciation & rental income

Appreciation & rental income

What this micro-market has appreciated at, and the rent a 2 or 3 BHK here actually commands.

Free. One call from an advisor, never sold on.

Handover

Possession & delivery

Build stage

Mid Stage (1-2 yrs)

Builder's target

March 2028

RERA committed date

August 2028

The developer is quoting March 2028, but the date it is legally committed to under RERA is August 20285 months later. Plan around the RERA date; the earlier one carries no penalty if it slips.

Due diligence

Legal & litigation

MahaRERA registration

P52100079071

Verify on the official MahaRERA portal

Litigation status

No litigation on record

Paperwork

Documents

Paperwork & documents

The title, approval and layout documents we hold on this project, and how to request copies.

Free. One call from an advisor, never sold on.

Developer

Builder profile

AR Realty

Years of experience

18

Total projects

4

Cities of operation

Pune

AR Realty has been developing in Pune since 2008 and is rated B-category in our internal builder grading, reflecting a shorter completed-project record than the larger Wakad developers.

Other projects

AR AtlasAR ImperiaSilver CrestaPride Signum

Get the free Property Engineer report on AR Mirador

Title and approvals, DP and survey verification, a 15-year builder search, registered sale agreements from the last six months, and area growth analysis — written for you, not for the developer. No cost, no obligation.

Ask about this project

We collect your name, phone number and the requirements you describe to respond to this request. It is stored on our servers in India and seen only by the advisor handling it — never sold or shared with a builder without your say-so. We keep it for 24 months from your last contact. You can ask us to show or delete it at any time at privacy@propertyengineer.in. Privacy Policy

Questions

AR Mirador — buyer questions answered

The questions buyers actually ask about AR Realty before paying a booking amount, answered from what we have checked on AR Mirador in Wakad. Where we have not verified something, the answer says so rather than guessing.

Builder credibility, legal standing & approvals

The questions buyers ask before trusting a developer with a booking amount. Answered from what we have verified — and where we have not verified something, it says so.

AR Mirador in Wakad, Pune is registered with MahaRERA under number P52100079071. A registration number on its own is not proof that the registration is still live: the MahaRERA portal shows the registered completion date, the current status and any extensions applied for, and that is what to check. The date filed with MahaRERA for this project is Aug 2028. Confirm the number against the portal before you pay anything, including a booking amount. Verify on the MahaRERA portal

AR Realty reports 18 years in the business, 4 projects. Named earlier work includes AR Atlas, AR Imperia, Silver Cresta, Pride Signum. We score AR Realty 66 out of 100 on track record, assessed from public records rather than from the developer's own material. Figures a developer publishes about itself are claims until checked, and where two sources disagree we score the more conservative one.

No litigation is disclosed against AR Mirador in the records we have checked. We have not published a separate 15-year civil and criminal search on AR Realty for this listing. "None on record" means none found in what we searched — it is not a guarantee that none exists. Civil, consumer, RERA and NCLT matters sit in different registries, and a fresh search before you pay is worth the hour it takes.

On AR Mirador specifically there is already a gap between the two dates: AR Realty is quoting March 2028, while the date committed to MahaRERA is August 2028 — 5 months later. The RERA date is the one that carries legal weight, and it is the one to plan around. We do not publish a completed-versus-promised delivery history for AR Realty's earlier projects on this page. That history is reconstructed from the MahaRERA filings of each past project — the registered completion date against the occupancy certificate date — and we do it as part of the free report on this project rather than repeating a claim.

We do not publish resident reviews for AR Realty, and we would treat any we found with caution: review sections on property portals are routinely seeded by developers and by competitors, so a rating there is weak evidence either way. What is worth doing is talking to the society office or a few residents at a completed AR Realty project — handover delays, water supply, seepage in the first monsoon and how maintenance was transitioned are all things people will tell you in person and will not write online. We arrange those conversations as part of an advisory engagement; ask us for the list.

We have not published a title opinion for AR Mirador on this page. A clear title means the 30-year search shows an unbroken ownership chain, no subsisting mortgage beyond the disclosed construction finance, no injunction, and 7/12 or property-card entries that match the promoter named in the RERA filing. Ask for the title certificate and the search report — both are documents the developer already holds, and a reluctance to share them is itself an answer.

The documents we have sighted for AR Mirador are: Commencement Certificate, Legal Title Report, Layout Plan. The set to insist on is the commencement certificate, the sanctioned building plans and layout, the environmental clearance where the plot size requires one, the fire NOC, and — for a completed building — the occupancy certificate. Ask for the commencement certificate specifically: construction that has started without one is the single most common approval defect in Pune.

We do not have the funding model for AR Mirador on record. Funding matters more than turnover for a buyer: a self-funded project stops when sales stop, while a debt-funded one carries a lender with a charge over the land, and a stalled project with a mortgage on it is far harder to unwind. You can check this yourself — the charges registered against a developer are public on the MCA portal, and the RERA filing lists the project's own financing. Insolvency proceedings, if any, appear on the NCLT and IBBI sites. Check company filings on the MCA portal

We do not publish a MahaRERA complaint history for AR Realty on this page, and you should not assume the absence of one here means there are none. Complaints are filed under Section 31 of the Real Estate (Regulation and Development) Act, 2016, and MahaRERA publishes both the complaint register and the orders passed. Search the developer's name and each of its project registration numbers — companies often build under a different registered entity per project, which is why searching only the brand name misses cases. The pattern matters more than the count: several orders on the same complaint type across different projects says more than one contested case. Search complaints and orders on MahaRERA

We have not published a defect history for AR Realty's completed projects, and we will not infer one from a score. Under Section 14(3) of the RERA Act the promoter is liable for structural defects and defects in workmanship, quality or services for five years from handover, and must rectify them within 30 days of being told, at no cost to you. The practical test is a visit to a AR Realty building two or three monsoons old: look at ceiling corners in the top-floor flats, the parking podium, and the external wall on the weather side.

Section 14 of the RERA Act binds the promoter to the sanctioned plans and specifications, and forbids alterations to the sanctioned plan of a building without the written consent of at least two-thirds of the allottees. To check AR Mirador yourself, compare the sanctioned layout attached to the MahaRERA filing against what is standing on site — floor count, tower positions, setbacks and the open space are the things that move. Unauthorised construction is not merely a paperwork problem: it can block the occupancy certificate for the whole building, including flats that were built exactly as approved.

Under Section 18 of the RERA Act, if the promoter fails to hand over by the date in your agreement you may either withdraw and claim a full refund with interest, or stay in the purchase and claim interest for every month of delay until you get possession. The remedy is yours to choose, not the developer's. The date that counts is the one in your agreement for sale, which is why the MahaRERA-committed date for AR Mirador — Aug 2028 — matters more than any date quoted verbally. Check what your draft agreement says about compensation before signing: developer-drafted clauses routinely offer a token per-square-foot amount far below the statutory interest, and a clause cannot take away a right the Act gives you.

We do not record industry-association membership for AR Realty, because it is weak evidence. CREDAI and NAREDCO are voluntary trade bodies, not regulators: membership is not an approval, it is not a quality certification, and it cannot be relied on the way a RERA registration can. If it matters to you, both bodies publish member directories for their Pune chapters and you can check the name there in a minute. Weigh it well below the RERA filing, the title search and the delivery history.

Everything below is public and free. On the MCA portal, "View Company Master Data" gives you the registered entity behind AR Realty, its incorporation date, paid-up capital and status; the signatory list gives you the directors, and each director's DIN shows every other company they run — which is how you find the sister companies a group builds through. Charges registered against the company show who has lent against what. On MahaRERA, searching the promoter name lists every project it has registered, with the committed and revised completion dates for each. The RERA filing for AR Mirador names the promoter entity; check that it is the same company whose track record you have been reading about, because the marketing brand and the registered promoter are frequently not the same. Look up the company on the MCA portal

AR Mirador is marketed with Swimming Pool, Gymnasium, Kids Play Area, Multi-Purpose Court, Yoga and Meditation Space and 6 more. What binds the developer is the amenity list in the agreement for sale and in the MahaRERA filing — not the brochure, not the render, and not the show flat. Section 11 of the RERA Act requires the promoter to deliver the amenities as declared to the authority, and the agreement is the document a court reads. Before signing, check each amenity you are paying for appears in the agreement's specification annexure with a delivery stage attached. Anything described as "proposed", "planned" or shown only in a render is not a commitment, and a clubhouse promised for "phase 2" of a multi-phase project may be years behind your handover.

Prices, possession & buying process

The practical detail on this project.

AR Realty's target for AR Mirador is March 2028. The date committed in the MahaRERA filing is August 2028. Where the two differ, the RERA date is the one that carries legal weight and the one to plan your rent or loan around.

AR Mirador offers 2 BHK and 3 BHK homes with carpet areas from 731 to 1124 sq ft. These are RERA carpet areas — the usable floor area inside your walls — not built-up or super built-up, which is what quoted rates on portals are usually based on. Compare projects on carpet area or the comparison is meaningless.

All-inclusive prices at AR Mirador run ₹95.38 Lacs – ₹1.50 Cr, depending on configuration and floor. Payments follow a CLP (Construction Linked Plan): Standard slab-wise payment against construction progress. Home loans of up to 90% are indicated. Ask for the cost sheet in writing: stamp duty, registration, GST where applicable, floor-rise, parking and the maintenance deposit are frequently quoted separately from the headline price.

Home loans of up to 90 per cent are indicated under the developer's payment scheme for AR Mirador. Individual lender panels vary, and a project being "bank approved" in a brochure means one bank has done its own legal check — not that yours will. We confirm the current lender panel as part of our advisory work rather than repeating the developer's claim. A bank's own legal team declining a project is a signal worth knowing about.

Yes. NRIs and OCI cardholders may buy residential property in India under RBI rules, with payments routed through NRE or NRO accounts and no special permission needed for a residential purchase. We handle documentation, power of attorney and remote signing for buyers of AR Mirador from outside India as part of an advisory engagement. Call +91 93738 11941 or write to hello@propertyengineer.in.